Jump to content

twin--turbo

Members
  • Posts

    2,863
  • Joined

  • Last visited

Everything posted by twin--turbo

  1. Depends on how freindly your school is, technicaly you need to ride it to work mostly. But nobody checks up on this and it makes no odds to the school.
  2. All our Xen Blades have 96 each that's 23 blades..
  3. IOS updates are avaialble for the Catalyst Witch range without a support contract and fixed config switches have a limited lifetime swap out warranty. We run entirely CISCO across both sites. Rob
  4. I would build 2 virtual servers on a new hosts. that way you can perform upgrades to each server platform that are required by the operation of it's service without possibly impacting the other service. Personaly I would use free vMware ( in fact I do at home as well as at work) Rob
  5. What are you actualy trying to do? Rob
  6. 6 of us saw it the weekend before last, wished we had done Dispicable ME 2. Plot was holier than the pope, dialouge rubish, 2 scientists just plain annoying. Also I had been out 2 nites earlier with the brother in law and was introduced to YagerBombs, every time they talked about the robots my head hurt. The Commanders Bravehart speach "Today we are canceling the Appocalyps" was cornier than mr Kellog. Why bild a super complex oversize wall all round the pacific? why not just cap of the rift with massive slabs of concreet and rebar! Why build BiPed robots? And worst of all the yager that survived the EMP as it was "Powered by analog not digital!!" That caught the attention of our troup.. Mind you our band was made up of 1 Chemical Process designer 1 Aeronautical Flight Dynamasist ( working on a unstable fighter plane ) 1 Network Chipset Design Engineer 1 Nucular Presure Vessel Engineer 1 Network Systems engineer (ME) 1 I.T. Support Engineer So we had a slight technical background ... Rob
  7. Any firmware updates available for the LSI? You also need to see if there are any S.M.A.R.T predicted errors as they may be causing problems. I would be looking at getting a new host and P2Ving the server Rob
  8. have you checked for a duplicate machine with the same name, that's 99% of the times we see laptops falling off domains. ( although usualy we have alternate staff comming in ) Rob
  9. Yes it would be too simplistic, they do strange things too. Rob
  10. Dual head, but be aware that if using extended desktop that interactive displays won't work correctly. We use Toshiba port replicators for our laptops as a single point of connection. They cause problems 3-4 times a week in one way or another. Rob
  11. Just go in, say that you tried the code on steam and it says it's invalid. They may have a no refund policy , but they can't refuse to exchange it for a working item. Rob
  12. got rconj runnign now I wana build a full network up again on Netware..
  13. It's done... Built Logged on with my old PC ( Virtualised 2.5 years ago ) Setup my old login account in C1 Sorted... Rob
  14. we ave one on an old Promethian V2 board, it's probably 4 or more feet out and just about fills the screen. Rob
  15. I am pressing our old Dell ( EMC Clarrion) AX4-5i back into frontline service as our P4500 HP is out of space. Rob
  16. The original was a Dell Poweredge 2300, Single P2, 3 18GB Scis's in Raid 5 , 256MB of ram...
  17. I am installing a VM as we speak it's named the same as the first 5.0 Server I built in 1999... Rob
  18. I have a vauge recolection of something, but we probably were on SP2 or SP3 within hours of installign 6.0... I do remember beign very annoyed to find our DLT7000 tapes despite being the same tape as DLT-VS80 wer formatted differently so we could not directly restoer the backup of our NW5 server to the new NW6 server... The file copy took hours. We still miss Zenworks Rob
  19. I used 4.x 5, 6 and 6.5 don't remember any major problems. Had mixed Netware and OES2 Linux boxes in the end. Rob
  20. Is this related to educational technicalness? Rob
  21. nssmu timesync (restart or reset) down inetcfg Dam I wana build one up again for fun...
  22. I was just thinking about Novell today, wondering if I could recall the main commands of netware if needed. it's 18 months since our last Netware box went off, a groupwise 8 server. I hate Exchange. Rob
  23. Zebra P300 and Easytrace to print on MiFare cards for lockers, doors, mfd, catering. Rob
  24. Leave them for 6 months then ZIP archive the user folders to near line storage. Disable the accounts if they have not returned in Y12. And delete after 12 months if they don't come back. Rob
  25. Sounds crap if you pay for support and they can't even tell you how to migrate to a new server! Rob
×
×
  • Create New...