Jump to content

Recommended Posts

Posted

3 days left until school is back and wondered what things people have got left to do?

 

I have

  • 40 laptops to rebuild (CC3 and its annoying SP3 update!!)
  • ceiling mount 2 projectors and whiteboards
  • install software handed to me on exam day
  • move 2 printers between buildings
  • replace a stolen PC for the cover manager

 

Oh and paint a wall before I can put up one of the whiteboards....... DONT ASK!!!!

 

And to top it all off I have CBA syndrom setting in......Not good at all lol

Posted

1. Install something on the Bursar's new PC for Teacher's Pensions

2. Threaten printers in IT Suite

3. Staff password resets (I might as well plan for them)

4. Create a few new pupil accounts

5. Thump printers in IT Suite

6. Staff password resets

7. Do the How to login/e-Safety/ Data Protection thing with a new teacher

8. Throw IT Suite Printers out of window

9. Staff password resets

10. About a billion other things that the other staff failed to put on the list of holiday jobs for me, all of which are needed by Monday and none of which are currently on my list.

11. Remember there's no budget to replace IT Suite printers :p

12. Password resets

Posted

Dang!!! Thanks for reminding I totally forgot about the new users etc... now that would have been fun on the 1st day back lol

 

Oh and snap! No budget (which I am use to as I didnt have one last year either) so I have to magic a new PC from thin air!

Posted

Build 3 new Admin PC's including all sims/fms/sco software, plus door monitoring software

Setup 48 netbooks

push out image to second ICT suite and install software packages

create new user accounts

setup new user accounts since recreated new user GPO's, moving to shared desktop setup

Setup 6 new teacher laptops

Install a new projector

install 2 new VI screens

recable 4 classrooms

install visualiser software on 20 laptops

rebuild the nursery PC

Install 7 new software packages to the entire network

Redistribute all the shared areas to newly created sensible layout

Workout why my NAS won't auto reconnect properly to the main server when server is rebooted.

 

Find time to recoup the 11 days of overtime they owe me already...

Posted
Set up 4 new computers, rename staff accounts of those who have married and complete a minor website update. Not sure I'll get it all done before next Tuesday :(
Posted

I'm quite pleased with how I've getten through my summer jobs. I have about 10 computers left to build, then walk around and turn everything on so every computer picks up the hotfixes (and SP3) that I've installed over summer. Couple of 5 minutes odd-jobs here and there, and then I think I'll take a look at the website/moodle/backup schema/esxi and do minor updates/make sure everything is working properly.

 

Hoping to put in a holiday on Friday as well as I'm heading over to the lakes with the tent and the missus. :)

Posted

3 laptops left to build and RM's CC3SP3 update has not helped either!!!

 

My business manager has just treated me to the biggest cream filled lemon bun i have seen in years!! She even made me a coffee to go with it :D

 

Nice to know my efforts have been rewarded (yes I am easy to please lol)

Posted

  • ceiling mount 2 projectors and whiteboards

 

Ceiling Mounted Whiteboards? Is this a new thing? lol .. :)

 

For me, I've got to go round and tidy up bits, put back together a classroom that was out of bounds due to a broken hot water pipe bringing down some previously examined and deemed to be safe Asbestos Panels so that area needed a full clear up (fun).

 

Then I've got new staff laptops to image (and indeed older staff laptops to create images for)

 

Then arrange for an ethical company to come and collect all the old machines at somepoint very soon (preferable before the IT and Art Teachers kill me .. lol)

Posted
Ceiling Mounted Whiteboards? Is this a new thing? lol .. :)

 

I'm trying to introduce new and novel ways of using them, not to mention a good way getting people to exercise, either climb up and down ladders (if they have had ladder training and all the proper risk assessments have been done) or by jumping up and down :target: lol

Posted
I'm trying to introduce new and novel ways of using them, not to mention a good way getting people to exercise, either climb up and down ladders (if they have had ladder training and all the proper risk assessments have been done) or by jumping up and down :target: lol

 

lol .. well let us know if it catches on .. lol ..

Posted

I got a phone call on sunday asking if I'd come in over the weekend and change the projector bulb. I said no, it was half way through the day and I had plans and a dinner to goto...

 

I came in yesterday to find someone's son came in and went up the 20ft ladder and did it instead....

 

I'd complain about it, but since the person who arranged it was the head, I think it might be a lost cause!

Posted

I think I need some more days!!

 

  • Build about 75 workstations onto the CC4 network
  • Make restore images of about 100 workstations
  • Build various packages
  • Reset user passwords
  • Update the inventory
  • Various other tasks that I've forgotten :(

Posted

Loads left to do to be honest! Although I went home on Friday last thinking all was sorted but as per usually, the teachers arrive on site after x amount of weeks off and expect you to do another x amount of weeks work 72hours before the start of term. Typical!

 

Eg: We asked for their laptops to be handed in during the summer break for updates and if they couldn;t get them to us before, then they should get them to us during the first few weeks of the hols otherwise if they leave til last minute, they will have to leave the lappies with us and we'll do them as soon as. You know what's coming next don't you!?!?! Today/yesterday, here's my laptop can I come and get it in half an hour etc etc etc. YES, I will drop everything I'm doing because you are ready to let me serve you oh great one(s)!

 

'effin' joke!

Posted

About 15 staff laptops, not handed in in July, left to rebuild.

Various bits of testing that applications have installed correctly.

About 100 staff pen drives to encrypt.

 

Oh and staff came back yesterday, pupils today!

Posted

Lets see....

Printers

Printers

Printers

Printers

Printers

oh and Printers

 

(yes you guessed it Printers + Windows 7 = chaos)

 

As well as get some PCs imaged (I think were down to about 30 to go now)

Finish updates for the MIS

Tidy the entire building (as ive got heaps of stuff in every possible space at present as its been a mega summer schedule!)

Create all the new users (staff included)

Sleep and rest for the chaos on Monday - IE Entire new Network, All reset passwords for every child in the place etc

Posted

what have we left to do, well with 0 days left, (kids return tomorrow) we have 35 computers to unbox, 30 set up but not yet built. 2 projectors/smartboards to go on a wall and err updates to roll out.

 

Is it our fault, no cos building works and failed deliveries kept us behind.

Posted

Was back today - kids tomorrow - thought I would have time to check everything......but it turns out the no member of staff could access their docs over the summer (offline file synchronisation) since we upgraded to Server2008R2. (any ideas, anyone?)

And I tried to install some programs but the installer kept telling me that I was installing Starting French - which I wasn't - and told me I couldnt access the program. This happened on three different machines!

AND I have to delete the old year 8 email addys (My boss said he'd done it) and the inventory - as well as getting rid of some kit which was SUPPOSED to go in the summer.

That's just one school. Tomorrow I go to the training day at the other one - what's the betting that similar things happen :(

Posted

Still on the to do list:

 

Create a master and image 20 pupil laptops. Create a master and image 22 desktops, and replace in classrooms and ICT suite. Upgrade the head's computer to Windows 7.

 

 

Issues still to be resolved:

 

Switches not seeing the network, wireless access points disconnected or reverted to defaults, so will need to reset.

 

Training day today but pupils back tomorrow - is it half-term yet?

Posted

oooh yeh I missed off my list we have an entire IT Room to fit and cable still, that is down to the roofers fault for STILL not being finished! GRRRRRR Never mind we have got 2 weeks into term to do it which is better.

 

Also have all the mandatory profile shizzle to make still for the kids, at least they are off until Monday so ive got all weekend to sort that out! Still need to finish unplugging all the old Wireless APs as well as we are done with our old wireless network for now.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



×
×
  • Create New...