ICTDirect_Dave Posted November 5, 2013 Posted November 5, 2013 I've got a load of HP Z600 & Z800 Xeon workstations at the moment. They're proving really popular as NM workstations. And with two 55xx series Xeon Quad Cores, upto 48GB RAM and an SSD I can see why!
unixman_again Posted November 5, 2013 Posted November 5, 2013 Dell Optiplex 755 - 2GB RAM, two core 3GHz CPU. Handled XP just fine, limps since we upgraded to W7 18 months ago.
clockend25 Posted November 5, 2013 Posted November 5, 2013 Little Novatech number that's been upgraded since. i5-3450, 8GB RAM, SSD, and another 500GB drive for a bit of storage. Duel 22" monitors.
jmak Posted November 5, 2013 Posted November 5, 2013 I snaffled the highest spec machine in the school when I rolled out Win 7 (elitism etc, I know) Core 2 Duo, 3 GB RAM and 74GB HDD Will soon be left behind though when I roll out the new laptops to teachers. I want them to have the newest machines as that hopefully reduces the chances of failures in classrooms (other than that our machines are all approaching 5 years old). If my machine goes down, I will probably find a way to get by, but classroom staff wouldn't.
sidewinder Posted November 5, 2013 Posted November 5, 2013 I use a standard PC that was in the round of replacements in the summer: Core i3-3220 4GB RAM 128GB SSD
gshaw Posted November 5, 2013 Posted November 5, 2013 Dell Precision T5400, getting on a bit now but would be quick enough to not skip a beat apart from the dire RAID controller that seems to not like disk writes very much, even slows down the Crucial M4 SSD I've got in it for VM use
RjMaJay Posted November 5, 2013 Posted November 5, 2013 Intel I5-3470 Nvida GeForce GT 610 4gb Ram 250gb Sata Drive and a Nexus
Chris_ Posted November 5, 2013 Posted November 5, 2013 I've got one of the newest RM Ones (EcoQuiet!) that were purchased before I started. i3 2120T, 19" widescreen. Upgraded to 20GB of RAM and a 120GB SSD and a 22" second monitor.
Dos_Box Posted November 5, 2013 Posted November 5, 2013 I've got one of the newest RM Ones (EcoQuiet!) that were purchased before I started. i3 2120T, 19" widescreen. Upgraded to 20GB of RAM and a 120GB SSD and a 22" second monitor. I'd keep hold of that. It's going to be a collectors item soon!
FishCustard Posted November 5, 2013 Posted November 5, 2013 I'd keep hold of that. It's going to be a collectors item soon! Curious as to why that might be...?
Dos_Box Posted November 5, 2013 Posted November 5, 2013 Curious as to why that might be...? You must be one of the last to find out! PC addict RM finally quits its building habit, plans to axe 300 jobs 1
FishCustard Posted November 5, 2013 Posted November 5, 2013 Ah, right. I haven't had to think about RM in a couple of months, so I'm not well up on their shenanigans!
Edu-IT Posted November 5, 2013 Posted November 5, 2013 Mine is a Stone built one, Core i3 with 4GB RAM. Does all I need it to do.
newpersn Posted November 5, 2013 Posted November 5, 2013 Mine is a Stone built one, Core i3 with 4GB RAM. Does all I need it to do. Snap. With a 120gb SSD Windows 8.1 runs quite nicely on it. May get more ram for mine though. ..
Chris_ Posted November 5, 2013 Posted November 5, 2013 I'd keep hold of that. It's going to be a collectors item soon! I think the few 380Z's we have will be more likely a collectors item than 300 mediocre RM Ones!
Chuckster Posted November 6, 2013 Posted November 6, 2013 HP Workstation XW6600 2 x Intel Xeon E5405 2.0GHz 16GB RAM 2 x 500 GB HDD 7200 RPM NVIDIA Quadro FX1700 graphics PCI-e 2 x USB 3.0 PCI-e 2 x eSATA 6Gbps The machine originally cost £800. I've added a few bits and bobs to it over the years that brings the total cost to approx. £1000 - £1100 - and I've had it since mid 2008; running Windows Server 2008 R2 as my main OS.
ICTDirect_Dave Posted November 6, 2013 Posted November 6, 2013 HP Workstation XW6600 2 x Intel Xeon E5405 2.0GHz 16GB RAM 2 x 500 GB HDD 7200 RPM NVIDIA Quadro FX1700 graphics PCI-e 2 x USB 3.0 PCI-e 2 x eSATA 6Gbps The machine originally cost £800. I've added a few bits and bobs to it over the years that brings the total cost to approx. £1000 - £1100 - and I've had it since mid 2008; running Windows Server 2008 R2 as my main OS. These machines are brilliant! We've sold loads of these. They run like a dream with a pair of E5450 3.0GHz Quads and 32Gb RAM
pavlovs_dog Posted November 6, 2013 Posted November 6, 2013 Have a really tight budget this year, so had to make do with this: Dell Precision T3600 Intel Xeon E5-1620 3.60GHz 16GB RAM 256GB SSD AMD FirePro W5000 Creative SB Recon 3D Roll on the new financial year!
john Posted November 6, 2013 Posted November 6, 2013 In my last place I had a custom built PC which had a nice Antec case (not a top end I will add just one for a few HDDs and front connectors), 2nd gen mid range i5, 16Gb Ram, 120GB SSD and a 1TB storage SATA drive, mid-range dual output VGA card for driving the 2 screens I had and a simple Coolermaster PSU. Cost about £500 in parts at the time so nothing outrageous and given I ran many VMs for testing and checking things it was certainly good value compared to a brand new HP of the same sort of spec. Before that I had a refurbished HP Pro Workstation from ICT Direct which did me nearly 3 years of good service 1
JoeBloggs Posted November 8, 2013 Posted November 8, 2013 HP 500B MT Dual core 2.8Ghz 4GB RAM 300GB HDD Feels a bit slow these days !
north-ict Posted November 14, 2013 Posted November 14, 2013 Stone i7-2600 3.4 Ghz 8MB Cache, 16GB Ram, Corsair Force Series 3 180GB SSD, Segate Baracuda 1TB 7200 RPM
andyfield Posted November 14, 2013 Author Posted November 14, 2013 Many thanks for the feedback. You have convinced me to upgrade my 6 year old rig.
browolf Posted November 14, 2013 Posted November 14, 2013 it was going to be an decent i5 workstation but then we needed a new fog server urgently so I donated mine. Have been using since, a dual core e7900 with win7 on and it's mostly alright. Now I don't want to change!
CHR1S Posted November 14, 2013 Posted November 14, 2013 Novatech Laptop - i7-2670QM 8Gb RAM 500Gb Hybrid drive + NVidia GT555m Would love a nice SSD in there but as I do a lot of media stuff I need the space. Battery life is amazing, considering the spec I easily get 6+ hours with mixed work.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now