Jump to content

Recommended Posts

Posted

Hi,

 

So we are just getting the final few problems ironed out of the network and its started to get a little quiet.

 

We've also almost finished getting moodle ready to go. Im now wondering what the next thing to work on could be?

 

What is everyone up to at the moment? Whats the latest thing your working on?

 

Many thanks,

 

Dan.

Posted

Deploying Lync, Exchange 2010, sharepoint 2010, project 2010,

moving from vmware to hyper-v, deploying wirless and getting set to ISO27001 security standards.

 

all in Q1, while we're doing 4 office migrations into our current domain

 

YAY!

 

For things that may benefit you a bit more, why not look at nagios or the dude for some network monitoring?

Posted

Writing proposals for:

 

1. Replacing staff laptops with desktops, a pool of laptops and a terminal server for the secondary school

2. Replacing all the machines in the primary school as they're 8 years old

3. Replacing our printers with a managed print system

4. Buying 2 new laptop trolleys and laptops for the primary school

5. Introducing UPSs into each comms cabinet around the site

 

Also, going to be looking to get a wireless site survey done to determine where our overpowered areas are and where our weak areas are.

Finishing the installation of our new UPS, and moving the old smaller one over to our core switch, router, phone system etc...

 

Planning our migration from Windows XP/Server 2k3 to Windows 7 and Server 2k8r2, including rebuilding the lot from scratch to remove the 'forest' we have at the moment, left over from the old BSF managed service.

Planning our migration from 12 servers to 3 virtualised servers using shared storage

Planning the introduction of SSO between our AD and Google Apps

Switching SIMS.net users to active directory logins instead of separate logins

 

Fixing our Cacti installation, implementing better monitoring within Spiceworks or maybe adding Nagios

Imaging Ubuntu netbook edition onto the 30+ eeePCs we have spare in cupboards and putting them in trolleys

 

Tidying our server room. Tidying our comms cabinets.

 

Probably some more to do too.

Posted

Currently implementing a Splicecom Pure IP VOIP System. Been running around like a headless chicken and the office is filling up with cardboad boxes. 119 phones in total. Phew.

 

Pete

Posted
Writing proposals for:

 

1. Replacing staff laptops with desktops, a pool of laptops and a terminal server for the secondary school

2. Replacing all the machines in the primary school as they're 8 years old

3. Replacing our printers with a managed print system

4. Buying 2 new laptop trolleys and laptops for the primary school

5. Introducing UPSs into each comms cabinet around the site

 

Sounds like me at the moment but on a 3x greater scale!

 

I'd be intrested to hear why you are looking at UPSs in comms cabs though?

Posted
Ohh, elsie - you can charge your own price - DON'T sell yourself short! They might be thinking "she's not working, and needs the money..."
Posted

Some busy people here.

 

Seems like localzuk is just about to start what weve been doing. few interesting issues with server 2k8 and windows 7. Most recent one is that we had to look into removing libraries from the left as it was saving into their profiles slowing login times. Server 2k8 GPO cant controll everything in Windows 7 so a few registry changes have had to be made.

 

GPP seems to work well though. Just dont do a delete all printer preference as it seems to kill log in times.

 

Writing proposals for:

4. Buying 2 new laptop trolleys and laptops for the primary school

 

I can recommend Novatech's trolleys. We've just brought one and its brill. Another local school recommended it to us

Posted

Nice to see other people got more on their plate! Although I still find my self keeping busy every second of the day while fighting off a cold and a very sore throat. No phone answering for me today :)

 

I am currently working on Frog, got a long list of things which need sorting out on our current site - mainly getting all the information on to it while improving the look. Nothing else really need doing except I need to create an account for the new HT! Seems an alright chap though.

Posted

  • Trying to move from staff laptops to a desktop in each room
  • Tidy the server room
  • Replace more ageing projectors with Casios
  • Replace the remaining few 3Com switches with ProCurves

Posted

  1. Testing software on Windows 7 for our upcoming deployment
  2. Swearing at stupid software
  3. Writing documentation
  4. Swearing at stupid documentation

 

You know, the usual!

Posted

About 5 years Windows experience, about 2 months Linux experience.

 

Currently trying to get Samba and Winbind working.

 

AAAAaarrghhh!!!11!11one!!1!!1eleven!!!11! *punch* *swear* *stab* *drink tea*

Posted
Not a lot... Just tidying up the network! Put in a new switch and patch panels as we have had some new offices put in the building! I'm also just trying to figure out how Sophos's patch management works in the new Enterprise Console!
Posted

Reviewing the documentation around the framework for emPSN.

Lots of choice and options for the east midlands public sector network post Oct, got a fair bit of work ahead choosing the best option for my cluster.

Posted

I'm currently working on:

 

Networked fire alarm proposal

Documenting everything ready for my paternity leave

Sorting everything out for our current reporting session - importing comment banks etc :(

 

Oh and in the next hour or so showing someone from an external company around our network in case of emergencys while I'm off on paternity leave

Posted

1) Clearing the decks ready for...

2) New rack and equipment being delivered ready for...

3) Setting up new Virtual environment ready for....

4) New network from ground up ready for...

5) Migration to S2008R2 & W7

 

Plus all the planning, testing and documentation that goes along with that. We really do live in Interesting Times!!

Posted

Currently installing BES onto a VM and looking into integrating Lync 2010 with our existing Cisco phone system.

 

Also looking at moving SIMS into a new XenApp 6.5 farm.

Posted

Planning a new network and getting prices together for it. On a major budget.

 

 

1) Clearing the decks ready for...

2) New rack and equipment being delivered ready for...

3) Setting up new Virtual environment ready for....

4) New network from ground up ready for...

5) Migration to S2008R2 & W7

 

Plus all the planning, testing and documentation that goes along with that. We really do live in Interesting Times!!

 

 

As above :)

Posted
Planning a new network and getting prices together for it. On a major budget.

 

I'm glad I'm not alone. Though after releasing information to staff and realising we have 28 weeks made me quiver slightly....

Posted
I'm glad I'm not alone. Though after releasing information to staff and realising we have 28 weeks made me quiver slightly....

 

28 weeks to put the network in place?

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



×
×
  • Create New...