Jump to content

Recommended Posts

Posted
*volunteers to be the fool as alway*

 

Give it a few weeks of playing with the VM and i'll be testing it on a file server which has our software installed. AS for production servers, next summer will be the start of upgrading 1 or 2 file servers as wont have any detrimental effects.

Posted
Give it a few weeks of playing with the VM and i'll be testing it on a file server which has our software installed. AS for production servers, next summer will be the start of upgrading 1 or 2 file servers as wont have any detrimental effects.

 

I have been tasked with updating

 

Both Hyper-V servers (from 2012r2)

SQL Server (from 2008r2) and to SQL 2016 (from 2008R2) (also physical to virtual and from four instances to 1 or 2 instances)

Both fileservers (from 2012R2)

Both Domain controllers (from 2012R2)

Both DPM servers (from 2012R2) and DPM itself from 2012R2 to 2016

 

pretty much next week (two-week half term here) - I might put some off til christmas.

 

My manager has a ot of faith in either microsoft or me

Posted
How long does it take them to reply? Just fired off a quick email asking for it to be added.

They should be quite quick, although every time I deal with them it takes several days in total because they don't read my e-mails properly or reply with idiotic responses such as "your volume licensing agreement doesn't have software assurance" when it does because we have EES / OVS-ES. :mad:

 

Dealing with MS is maddening. :(

  • Thanks 1
Posted
what details do they require on the email to get them to add?

You need to e-mail them your volume licensing agreement ID and do it from the e-mail addresses associated with your VLSC account.

Posted
They should be quite quick, although every time I deal with them it takes several days in total because they don't read my e-mails properly or reply with idiotic responses such as "your volume licensing agreement doesn't have software assurance" when it does because we have EES / OVS-ES. :mad:

 

Dealing with MS is maddening. :(

 

Just call them, this is one time where it is definitely the better option, as stated by numerous people in the past here. I was sorted in 5 minutes and the keys appeared almost instantly

Posted
Downloading as we speak, but going to need a double sided DVD as 2016 Standard & Datacentre weighs in at 5430MB! 2016 Essentials is 4473MB.

 

Server 2012 R2 also required a dual layer DVD ;)

 

Weirdly enough I can't remember the last time I actually had to do a server install other than ESX on physical hardware!

Posted
Love ESX but wanting to move to Hyper-V now due to their offerings of SSDir, question is can I be ass'd to turf over the whole environment (SAN, Servers and VM's) to Hyper-V... That's a lot of work...
Posted
Server 2012 R2 also required a dual layer DVD ;)

 

Weirdly enough I can't remember the last time I actually had to do a server install other than ESX on physical hardware!

 

Don't we just make bootable usb sticks these days?

Posted

Server 2016 standard under downloads is datacenter.

When you click on standard the text reads "Standard/Datacenter and something else ive never heard of..."

Posted
Are SCCM and DPM only available with a Datacentre subscription? We just have two standard licences and neither are available from our portal. :(

 

SCCM and DPM are totally separate products you have to buy licenses for vs the Server OS.

Posted
SCCM and DPM are totally separate products you have to buy licenses for vs the Server OS.

 

Have you not updated SCCM to 1606 through their new patching method or you doing a fresh install?

Posted

In terms of the USB sticks, I highly recommend Rufus to create them :)

 

There is a Microsoft USB tool but it doesn't seem to have been updated recently and therefore doesn't seem to fully manage to prepare the drive for booting

Posted
Have you not updated SCCM to 1606 through their new patching method or you doing a fresh install?

 

Patching method all the way! We've been deploying the latest versions as they become available for the past 6(?) months or more on SCCM, no need to clean install.

 

We don't use DPM, but AFAIK that doesn't have the new patching SCCM does?

Posted
Patching method all the way! We've been deploying the latest versions as they become available for the past 6(?) months or more on SCCM, no need to clean install.

 

We don't use DPM, but AFAIK that doesn't have the new patching SCCM does?

 

Nice nice, was just curious as to why you were happy the new SCCM release is available. I'm going to be lazy and in place upgrade my SCCM box from 2012 R2 to 2016, if it F's up then that's what one-click Veeam restore is for!

 

Gotta love virtualisation and not having to worry about making so many plans, preparations and endless technet reading over and over and over again.

Posted

Playing with my new server running 2016 as the Hyper-V host..... of note so far is how much quicker things seem. Building fresh 2016 VMs doesn't seem to be taking any time at all. Could be down to the shiny new server hardware but seems pretty good so far.

 

Pete

Posted
Playing with my new server running 2016 as the Hyper-V host..... of note so far is how much quicker things seem. Building fresh 2016 VMs doesn't seem to be taking any time at all. Could be down to the shiny new server hardware but seems pretty good so far.

 

Pete

 

Thought that was a ReFS feature?

Posted
Thought that was a ReFS feature?

 

Sorry to hijack here..... would you have the volume that stores the vhdx on an refs file system and the vhdx formatted as ntfs in the vm?

Posted

If you want to use it then the volume that you store the vhdx on should be formatted to ReFS

have what you like in the guest - depends what you are using it for.

  • Thanks 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



×
×
  • Create New...