Jump to content

K.C.Leblanc

Members
  • Posts

    2,706
  • Joined

  • Last visited

Everything posted by K.C.Leblanc

  1. I might be a special case, but I managed to kill an ADSL signal with about 25 meters of internal telephone cabling.
  2. I don't know if it'll play nicely with Winsuit, but Digital Architects Software - Orphans Remover might be worth a look. It can be run from a log on script. EDIT: You could also do something like this if not exist "C:\program files\blackcat\information workshop.exe" del /q %userprofile%\desktop\blackcat.lnk You;d need to have two links in place, and then the dead one gets deleted.
  3. Slightly off topic, can you check what revision gbic you're using from the console (I'm too nice to wonder round pulling fibres out). I'm upgrading most of our switches at the moment. I don't want to suddenly discover some of our gBics have died.
  4. You need to start by looking at the brackets you already have and their distance from the board. With a bit of luck there's something on the market that'll fit and project the same size from the same distance. We discovered this to our cost when we had 5 random old projectors changed, we had to have all the brackets moved. What sort of projectors are you replacing? Have a look here. Projection Calculator Classic - Throw Distance and Screen Size
  5. I would probably start by having an audit and finding out what's on the machines. Then seeing what you can reconsile against your paperwork. Anything you can't find licences for you need to contact the publishers and see if they have any record of you. It's also worth speaking to your burser and seeing if they will probably have record of software purchases.
  6. Desktops in every class room (mostly C2D machines under a year old). We've found wireless isn't reliable enough, we've also found that not all teachers are capable of connecting a laptop to a projector. We also issue all full time teachers laptops.
  7. If dogs in the lyrics are enough.... Frank Zappa - Don't Eat The Yellow Snow.
  8. But Lego has pointy edges, that would be horrible.
  9. Any of Gerry Halliwell's solo stuff.
  10. £6k should be more them enough (you could probably get two servers for that). However if performance is a big issue you should no just be looking at your server but also your switches (particularly if they're the same age as your server). I take it you're also going to need some sort of backup solution. What OS are you planning to run and will it be 32 or 64bit?
  11. I had a good look at the Samsung Q1 at BETT. It looked ideal for this purpose....... ........till I discovered they were £600.
  12. You can also set the permissions of local profiles using a GPO.
  13. Pop over the OcUK forums and have a look through the Sound City and the Home Thearte and Audio forums. EDIT: If you register bare in mind you won't be permitted to mention CPLtd, it's against their rules.
  14. Audio Recording and Editing (Audacity) Video Editing (Movie Maker and Serif Movie Plus) Fortran Compiler
  15. File permissions shouldn't need changing, they main topic you'll have to look into is Group Policy. Lots of schools now use it to lock down their workstations. You however will have to forgot WinSuite's logging and auditing functions. Since the last time I did anything with WinSuite was in 2001, I don't know exactly what functionaly you'll be missing. You'll also need to work out a method to only apply the group policy to the netbooks and not the whole network. Do I dare ask why the head of ICT is so attached to WinSuite?
  16. if exist c:\staff.txt shutdown /s /f /c "Mr Eric is coming with his clue bat, leave while escape is still possible."
  17. I think it makes him look even more like Meatloaf. Maybe we need an EduMobChop logo.
  18. I don't advise a haircut, man. All hairdressers are in the employment of the government. Hair are your aerials. They pick up signals from the cosmos and transmit them directly into the brain. This is the reason bald-headed men are uptight. Withnail and I, 1986. I think I might have to get my mob chopped. It hasn't been done for over two years now.
  19. I seem to remember if you got to £2bn it would roll over.
  20. It is very good, also the signaling is light years ahead of the original.
  21. We've got a lecture hall being built. Our preferred solution is about £26k.
  22. It depends on the layout of the hall and also the level of flexibility you require. The trouble with that sort of arrangement is you're expected to 'set it up' every time it's used. It's also not idea if you want to get a long way back to project a big image. The end result is the equipment gets used less. In our hall we have a ceiling mounted projector with a dedicated desktop PC. We've also got an AMX control panel which controls the projector, dvd/video player and the sound. The net result is a system so easy teachers and students can just go and use it without giving any notice. The equipment is probably used daily.
  23. It's like a normal projector to make it go bigger you've got to move it further from the screen. If I've read the details for that bracket correctly (they're a bit vague), the biggest it can go with that bracket it 60". I'd get an AV company in to come up with some ideas.
  24. Smartboard, unless you evisage furniture being bounced off it. Projectors, we've got a lot of NEC VT58s, which are fine. We've also got Tosh T95s, because they match the throw distance of the HPs they replaced.
  25. Is 60" going to be a big enough picture for a hall?
×
×
  • Create New...