We have a HP 5412zl2 running as our Core switch. It has 2 PSU installed, During the half term i did some UPS testing and noticed that when we lose a UPS the core lose half its power. and same when the other UPS is tested.

 

Looking at the config - It doesn't look like redundancy has been setup

 

Does anyone know how to set this up?

 

Thanks

 

 

HP-Switch-5412Rzl2# show power

 

Status and Counters - System Power Status

 

System Power Status : No redundancy

PoE Power Status : No redundancy

Operational Power Status : No redundancy

 

 

Chassis power-over-ethernet:

 

Total Available Power : 4357 W

Total Failover Pwr Avl : 2056 W

Total Redundancy Power : 0 W

Total Power Drawn : 0 W +/- 6W

Total Power Reserved : 0 W

Total Remaining Power : 4357 W

 

Internal Power

 

Total Power Aux Power

PS (Watts) (Watts) Status

----- ------------- -------------- ---------------------

1 0 Not Supported Not Connected

2 0 Not Supported Not Connected

3 2279 1400 POE+ Connected

4 2078 1295 POE+ Connected

 

 

Refer to command's help option for field definitions

Posted (edited)
As in the PoE loses it's power on half the switch or the modules lose power on half the switch where the PSU is?

 

We have no POE modules installed. - Just 10 x 1/10GB SFP+ and 1 24 port Ethernet installed (Non POE)

 

Modules lose power on half the switch.

 

Thanks

 

- - - Updated - - -

 

Detailed information below.

 

HP-Switch-5412Rzl2# show system power-supply detailed

 

Power Supply Detailed Information

 

PS Model Serial State Status

-- ------ ---------- ---------------- -------------------------------------

1 Not Present

 

2 Not Present

 

3 J9830A IN58G4G1P1 Powered AC Power Consumption : 257 Watts

AC MAIN/AUX Voltage : 232/234 Volts

Power Supplied : 182 Watts

Power Capacity : 2750 Watts

Inlet Temp (C/F) : 29.0C/84.2F

Internal Temp (C/F) : 68.0C/154.3F

Fan 1 Speed : 2550 RPM (47%)

Fan 2 Speed : 2550 RPM (47%)

 

4 J9830A IN58G4G1RB Powered AC Power Consumption : 260 Watts

AC MAIN/AUX Voltage : 232/233 Volts

Power Supplied : 183 Watts

Power Capacity : 2750 Watts

Inlet Temp (C/F) : 28.3C/83.0F

Internal Temp (C/F) : 71.1C/159.9F

Fan 1 Speed : 2200 RPM (40%)

Fan 2 Speed : 2250 RPM (41%)

 

 

 

2 / 4 supply bays delivering power.

Currently supplying 365 W / 5500 W total power.

 

Refer to command's help option for field definitions

Edited by newpersn
Posted
I think this is 'a feature' it certainly was on our one. We just made sure to patch anything critical or that was also held up by UPS to the half of the switch that stayed up.
Posted (edited)
I think this is 'a feature' it certainly was on our one. We just made sure to patch anything critical or that was also held up by UPS to the half of the switch that stayed up.

 

Yeah - It looks like its not been enabled. This is where I'm failing to get it enabled. It looks like it load balanced rather than being set to redundancy.

Edited by newpersn
Posted (edited)

I can't be sure but I think you need 3 PSUs to have redundancy on the 5412zl.

 

Because the switch can run on a single supply, removing a redundant supply

will not interrupt switch operation. However, on the 5412zl one power supply

will only supply enough power to run the module slots A-F. Slots G-L will not

receive any power unless there are at least two power supplies installed. For

more information regarding power see the:

■ ProCurve Switch zl Internal Power Supply Installation Guide.

■ ProCurve Power over Ethernet (PoE) for zl and yl Products Planning

and Implementation Guide

 

Page 1-12 of following

https://ftp.hp.com/pub/networking/software/5400zl-InstallGuide-June2006-59914713.pdf

Edited by Davit2005
Posted

On my 5412zl I was running 2 x 48 POE ports and 1 x fibre and 1 x 10-GBE and 2 x PSU was not enough I had to order the full 4.

 

The switch stayed up then!

 

I wouldn't have expected you to need 4 if your not running any POE though. Mind you it wasn't really explained simply anywhere that I could find at the time.

  • Thanks 2
Posted

I can't speak to the 5412 but i seem to recall the older 8200zl had a split backplane, with two PSUs one on each you would loose half the switch if there was a power/psu failure. You needed 4 PSU if you wanted all ports to stay up.

 

The design being that you connected every host/switch to it via two routes, one on one backplane one on the other - thus losing half the switch wouldn't matter.

  • Thanks 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



×
×
  • Create New...