Jump to content

Recommended Posts

Posted

Hi all

I have a two week cycle set up but Nova thinks that Mon:A3 and Mon:B5 are on the same day and therefore won't schedule lessons on these slots because of the one per day rule. I don't want to switch it off becasue of autoschedule but I know that it is making my life difficult. I've aattched an image to demonstrate. In this instance I can't drop the lesson En with CNH into the blank because it clashes with En with NSC, even though they are actually on different days. This is just one example but I'm sure there are lots of times autoschedule has worked around this problem. I am finding it really hard to schedule this timetable but I have a contact ration of 0.67 so it should be really easy!!!!

 

What can I do? Have I set my cycle up wrong? Would it make a difference if the days were labelled as AMon:3 and BMon:5? If yes then how do I change that with some of my timetable built already?

 

Please help?

 

Dave

Capture.PNG

Posted

can you post a screenshot of your cycle?

 

I know ours is Mon1:P1 and Mon2:P2 so maybe yours is getting confused because they both look like the same monday?

Posted
Seeing the cycle would help - from that screenshot it looks like the periods have been named but it isn't actually a two-week timetable: it it was the period names would be Mon1,Mon2 etc. It looks like you have a one week timetable with double the number of periods per lesson. Are you intending to use the "Create week two" process to generate the second week ?
Posted

Hi both

Sorry for the late reply, I had to go to a meeting. I have attached a copy of the cycle for you to see. I'm planning to run interleave to split the weeks.

Dave

Capture1.PNG

Posted
As it's the same subject but different member of staff, you could set the one per day rule to cluster by staff for that block and it should do it.
Posted

I don't know the answer to that sorry, I've been out of the loop in doing a two week timetable since it was introduced as someone else took it on.

 

I don't think your model is wrong as you are going to interleave it, I think it's a limitation of the interleave process which leaves you two options. 1 - suspend the one per day rule in some form and do it that way. 2 - make a note of the additional things that you need to schedule, do the majority, interleave it and then do the additional scheduling.

 

I might be wrong, but it's what I take from having a quick glance at the Nova T6 manual, approximately page 475 (limitations of interleave).

Posted

It looks like this might be an issue with the sessions and block shape ?

Is it that you have all double periods in the block shape from the screenshot but you are trying to schedule singles ?

Posted

When we had this set up we had the cycle the other way around. ie:

mon tue wed thu fri mon1 tue1 wed1 thu1 fri1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



×
×
  • Create New...