How is the network holding up?

 

Network is holding up fine, doing the big upgrade to Win10 and Server 16 this summer.

 

We are still running on generators as well but they massively over killed on my server room UPS. I have 6 servers, 1 san, 3 switches and 4 controllers (ruckus, smoothwall etc) and it says it will power them for 4 hours!! Had 2 issues with the generators in 20 months but i was never concerned with that amount of protection!

 

Biggest issue ive had is with the intruder alarm where the cables run underneath the buildings and animals are eating the cables!

  • Thanks 2
Posted
How long until the new building is complete?

 

Early 2019 is all we have been told at this point, by the looks of the building i'm guessing either Feb 1/2 Term or Easter.

  • Thanks 1
Posted
What network you got going into the new build?

 

I've got HP switching/servers/san/desktops/printers and Ruckus WiFi in the temporary classrooms and will just be moving it over to the new build and double the amount of switches!!

Posted

5406 Core Switches

2920 Edge Switches

R510 AP's

DL380 G9 Servers

 

Cant remember the desktops but i5 8gb RAM & 120SSD

 

So i have the insurance to thank for a smoothly running network of new equipment but the downside is that it will all need replacing at the same time! Been working with the business manager to write a new rolling replacement plan into the budget....

Posted
I did a big deployment last year for a school of 2920 models, stacked them bad boys!

 

Yep think due to the location of the server room 85% of the network points for the whole school are cabled back to the server room!! This is going to result in 16 x 2920 stacked as 4 groups of 4

Posted
So you've dualed up on the core switches too? Nice!!! Simply could not afford to do that when I bought my 5412 and 2530s

 

Yes 2 x 5406 stacked and the servers have 20g connection to each switch. All other devices where possible have 2 network connections, one to each switch for full redundancy! I had a 5412 before the fire and the 2 x 5406 just gives a little piece of mind that there is not a single point of failure.

Posted
Yes 2 x 5406 stacked and the servers have 20g connection to each switch. All other devices where possible have 2 network connections, one to each switch for full redundancy! I had a 5412 before the fire and the 2 x 5406 just gives a little piece of mind that there is not a single point of failure.

 

Agree. With hindsight that would have been the way to go, I was worried about future expansion but in the end we have not expanded as much as I expected! Mostly wireless not wired!

  • 8 months later...
Posted
Also below are a couple of photos of my server room and new office.

 

Is 14 double power and 11 double data enough in my office? ;)

Better than the four data points I have in mine. Brand new building, plenty of data points to go around and you put 4 in the IT office. Muppets.

 

Good luck with the new building!

Posted
Better than the four data points I have in mine. Brand new building, plenty of data points to go around and you put 4 in the IT office. Muppets.

 

Good luck with the new building!

 

They asked me how many i wanted so i said loads.

 

They originally had 24 data per classroom - not IT classroom, standard classroom for english etc.....

 

I told them to stop being stupid as unless my server room was the size of a classroom with about 6 data racks in it then they need to cut it down! 40 classrooms at 24 points per room thats a whole load of patch panels and switches!! reduced it to a more sensible 4 per room plus high level for WAP.

Posted
Update

 

Is 14 double power and 11 double data enough in my office? ;)

 

Should be plenty - however I bet you will find yourself short with a year

 

probably when the summer gets hot again and you want a fan and find every socket if in use - if you are like me you will find several filled up with power lead with nothing on the end of them!

Posted

4 data points is enough, 1 per switch.

 

There is a balance to be struck for standard classrooms, ease of installation now vs cost later. But so much stuff is wireless these days.

 

What else did you end up with controlled by IP? phones? gates? alarms? lighting?

Posted
4 data points is enough, 1 per switch.

 

There is a balance to be struck for standard classrooms, ease of installation now vs cost later. But so much stuff is wireless these days.

 

What else did you end up with controlled by IP? phones? gates? alarms? lighting?

 

Phones, CCTV, Access Control all by IP.

 

Alarms have their own cabling.

 

Lighting we have some weird light switches that can do 'scenes/moods' ie all on full, on half, on very low, dimmed at front but not at back. All in all about 8 buttons to turn a light on! This is per room, also have motion on every light so if someone goes home and leaves their lights on it turns them off after X amount of time.

 

Gates are not electric at all just old fashioned hinges. Only have 2 though so not too bad - im going to look to tie this in to CCTV with ANPR for the staff cars to auto open. Our visitors car park is outside of the gates so its just staff car parks.

 

I have 3 days worth of training on everything in the new build to come in the next few weeks. Doing everything from Alarm panels, fuse boards, solar panels to boiler software. Because 99% of it runs on a computer im doing all the training along with the premises team.

Posted
Lighting we have some weird light switches that can do 'scenes/moods' ie all on full, on half, on very low, dimmed at front but not at back. All in all about 8 buttons to turn a light on! This is per room, also have motion on every light so if someone goes home and leaves their lights on it turns them off after X amount of time.

Sounds like DALI - i've just put it in at Church, but the main room switches just turn on/off. The control desk can dim/kill certain combinations for drama, theatre, projection of film modes.

 

I have 3 days worth of training on everything in the new build to come in the next few weeks. Doing everything from Alarm panels, fuse boards, solar panels to boiler software. Because 99% of it runs on a computer im doing all the training along with the premises team.

I'd love that opportunity!

Posted
Phones, CCTV, Access Control all by IP.

 

Alarms have their own cabling.

 

Lighting we have some weird light switches that can do 'scenes/moods' ie all on full, on half, on very low, dimmed at front but not at back. All in all about 8 buttons to turn a light on! This is per room, also have motion on every light so if someone goes home and leaves their lights on it turns them off after X amount of time.

 

Gates are not electric at all just old fashioned hinges. Only have 2 though so not too bad - im going to look to tie this in to CCTV with ANPR for the staff cars to auto open. Our visitors car park is outside of the gates so its just staff car parks.

 

I have 3 days worth of training on everything in the new build to come in the next few weeks. Doing everything from Alarm panels, fuse boards, solar panels to boiler software. Because 99% of it runs on a computer im doing all the training along with the premises team.

 

Nice, should be able to sync the excess solar power with the water heaters etc, become a 0 carbon school, might help mitigate all the carbon released when it was on fire last time

  • Thanks 2
  • 1 month later...
Posted
We are in!!

 

We are now on day 6 of being in the new school and OFSTED have decided to grace us with their presence for 2 days as well!!

 

Everything is all in and working as it should just a few things need tidying up.

 

Few pictures attached that we had taken before we opened, i upload a couple of videos im in the middle of putting together showing a couple of time lapse cameras, drone footage and photos.

 

[ATTACH=CONFIG]53211[/ATTACH][ATTACH=CONFIG]53214[/ATTACH][ATTACH=CONFIG]53207[/ATTACH][ATTACH=CONFIG]53208[/ATTACH][ATTACH=CONFIG]53209[/ATTACH][ATTACH=CONFIG]53210[/ATTACH][ATTACH=CONFIG]53212[/ATTACH][ATTACH=CONFIG]53213[/ATTACH]

 

It looks superb mate! Congrats to you all for getting it sorted and thanks for keeping us up to date throughout the whole thing. :)

Posted (edited)
We are in!!

 

We are now on day 6 of being in the new school and OFSTED have decided to grace us with their presence for 2 days as well!!

 

Everything is all in and working as it should just a few things need tidying up.

 

Few pictures attached that we had taken before we opened, i upload a couple of videos im in the middle of putting together showing a couple of time lapse cameras, drone footage and photos.

 

[ATTACH=CONFIG]53211[/ATTACH][ATTACH=CONFIG]53214[/ATTACH][ATTACH=CONFIG]53207[/ATTACH][ATTACH=CONFIG]53208[/ATTACH][ATTACH=CONFIG]53209[/ATTACH][ATTACH=CONFIG]53210[/ATTACH][ATTACH=CONFIG]53212[/ATTACH][ATTACH=CONFIG]53213[/ATTACH]

 

That's just ridiculous - Ofsted once again showing they show zero care for the schools they inspect.

Edited by Primus

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



×
×
  • Create New...