Jump to content

Building a new server rack (pics and worklog)


Recommended Posts

Posted (edited)

I'm just building a new server rack so thought it might interest some people to keep a log. I also have a few questions.

 

Its a dell 2420 Poweredge 24u Rack. The idea is to move all current servers virtualized into it over time.

 

2951.jpg

 

Equipment list

- 4 x Poweredge R300, 16gb Ram, 500GB hard disk, Xeon cpu

- 4 x Dell Extendable rack mount Rails

- 2 x APC Smart UPS 3000va

- 1 x Dell UPS 1920va

- Dell 1U Keyboard/Video/Mouse

- Dell 1U static equipment shelf

- Netgear GS724T 24 port gigabit switch

- Some cool neon lighting :)

- Customized server faceplates

 

 

Is there anything I'm missing before I start construction?

Edited by zag
Posted (edited)

depending on the size of racking a 2nd person

long enough power leads to reach wall sockets

power bars for monitors or anything else not ups powered

captive nuts and bolts for the switch / other gear mounted directly to the uprights

label maker

Edited by sted
  • Thanks 1
Posted (edited)
power bars for monitors or anything else not ups powered

captive nuts and bolts for the switch / other gear mounted directly to the uprights

 

Got a link for those captive nuts from anywhere? Thats the first problem I've come up against, nothing to screw into!!

 

Also need a good looking power bar. The more flashy lights the better :D

 

Heres first pic before its all built:

 

IMAG0285.jpg

Edited by zag
Posted
no i just go to the cupboard and take a box (dont work direct for a school work for a support company) but id suspect scewfix do them or failing that ebay lol
Posted
They are so useful!!

 

how on earth does that removal tool work i know its a pita getting them out and can end up with sliced fingers when the driver slips

Posted

Plasters (or superglue) for when the cage nuts/that unfinished edge you managed to slide your finger across take their tithe of blood.

 

Roll of velcro.

Posted

  • More RAM for your vhosts ;)
  • PDUs coming off the UPS
  • Environmental monitoring unit
  • Colour coded cables at the correct length
  • Dymo labeller
  • Cable labels, either those little tag ones or sharpmark wrap around type http://www.sharpmark.com/Cable-labels
  • Double sided velcro for tying up cables
  • 1U Cable management arms

  • Thanks 1
Posted
Are the drives hotswap?

 

No, standard 1 internal 500gb drive in each.

 

I'm figuring since they are virtualised I can just move them to a different machine if they ever fail.

Posted
No, standard 1 internal 500gb drive in each.

 

I'm figuring since they are virtualised I can just move them to a different machine if they ever fail.

 

Wouldnt you need 2 disc over a raid? (if i worded that right)

Posted
Hyper-V or VMware? We run our ESXi hosts on SD cards as the config is so minimal there's no point spending money and power on hard drives. Can't do a sub 50MB install with Hyper-V (yet) though :p
Posted

it looks like you need to go round the back of the nut and squeeze. I had a removal tool which shipped the hp racks which works from front and is very effective. Still a bit fiddly, but less risk of hurting yourself.

 

another vote for the color coded patch cables, i made the mistake of going down the route of same colored cables, and gave up trying to color code each end afterward.

Posted
If you're clustering stuff, if you can get coloured velcro (or anything to differentiate) that's always handy for seeking out the correct set of cables to unbundled when you need to add/remove any cables to that box.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



×
×
  • Create New...