Jump to content

Recommended Posts

Posted

As we break up a week earlier than most and get 3 weeks off (poor teachers) I have managed to start cabling earlier than usual.

 

I have currently used a full real of cable and 60+ metres of cat5... oh and used my lovely new SDS drill to drill through 80cm thick walls :) I love the holidays.

 

Now I have just got to work out how to fit the Sanyo short throw projectors to the crumbly walls :confused:

Posted

A full real is 320 Meters any less you have been had.

 

And i would be putting no less then cat 6 in.

 

Like i have, so i can do GIG and POE with no problems.

And Cat 7 for 10GB back bones between hubs and servers.

 

:) :) :) :)

 

 

Why? Coz i can init.

Posted
I think it might be 304.8m - historically, the reels were 1000 feet so I reckon that it will still be that long. Not sure how much the odd 20cm matters (and no sniggering at the back!)
Posted
Why cable yourself when there are companies out there who will install twin data ports for a mere £60. When you work this out it may take them 3 - 4 hours depending on the run so that works out to be around £15 - £20 per hour. If you on the other hand have 4 twin data ports to install it could take you longer which would in effect cost more overall, when you could be getting on with more crucial work which begs the question why DIY. ;) :)
  • Thanks 4
Posted

I have to say when factor in cost of time getting people into to do cabling makes more sense.

 

A good example I heard today.

 

"You might be able to rake leaves in your yard and do it in 15 mins. It might take local kid 30 minutes. While in time it is quicker for you to do it. Problem is while you are doing that you not doing something else that no one else can do it"

 

So be blunt I rather pay someone do cabling so I can be focusing on other things.

 

Anyway just lugged boxes to IT Room ready for next week well tomorrow as we start moving computers around from lunchtime.

 

Russ

Posted

I do it because I enjoy it and its nice to have a break from sat at a computer all week, I always do the cabling here except when we have a full refit then the sparky does it.

 

Love to see a firm run cables around our school for £60, everywhere needs trunking and there are loads of angles per room to sort out.... its not cost effective.

 

I was going to put CAT6 in but didn't want to at this time, its a personal choice.

Posted

@Simcfc73:

But it is not cost effective when you measure the time spent doing the job yourself against your pay per hour and that which a company charges.

It may be personal preference for you but it is costing your school more money and effectively you are paid by us the taxpayer so we would expect good value for money.

I am not saying that you personally are not effective at what you do and I don't mean to imply anything but given a scenario of say 20 double data ports for a computer suite I would say the company I use would have that done in maximum 2 days whereas If me and my technician was to do the job it would probably take a week approx.

the fact is 20 X 60 = £1200 for company to do it and 37 X 2 X 18 = £1332 X 2 which is the time spent not doing anything else = £2664.00.

 

You can see my point hopefully and do not take it the wrong way this is business sense nothing personal. ;) :)

Posted

but we are private school, I only want 12 points and its taken me 3 days to do it.

 

The only way it would be cost effective would be of I was not soing other stuff I should be, which I am not.

 

Anyway, think I have knicked a cable somewhere so I need to look through the trunking.

 

Pub lunches are ace.

Posted
I find its pretty hard to get anyone in to do a small number of points, I was quoted just over £1k for 8 points(in the same room with dado trunking all round) plus an uplink for our DT lab(in the basement of one of our buildings), the lowest quote I had was around £600 so me and the site manager did it ourselves... think it came to around £250 including a few extra tools, a patch panel and some external cat5(I already had a few boxes of cable left over by some previous contractors).
Posted
but we are private school, I only want 12 points and its taken me 3 days to do it.

 

The only way it would be cost effective would be of I was not soing other stuff I should be, which I am not.

 

Anyway, think I have knicked a cable somewhere so I need to look through the trunking.

 

Pub lunches are ace.

 

 

The private school point is so important... it ups the cost of evrything by 15% automatically as we have to pay VAT unlike our state school counterparts :(

Posted

We do all cabling ourselves except fibre, or any stupidly big projects (e.g. putting 70 points in a new computer room within a week). Experience with our local contractors isn't the best, we've found they cut corners - 2 years ago they put cabling in about 20 classrooms, most of that has had to be repaired in some way (vandalism isn't that bad in our school, other ports have been fine).

 

Although yes, if there is other stuff to be done and limited time then IMO it makes sense to get them in.

Posted
Unless its a full IT Suite or fibre. we tend to do it ourselves here too.. Normal CAT5e/6 runs are done by our sparky - fibre runs by another company (NorComm IIRC)
Posted

I've changed my mind, get people in :)

 

I only had one full reel and all but one cable doesn't work. I did rush and do it on Friday but the cables seem fine. Going to buy myself a tester and check the cables when I am back in next week. Can't believe the reel was faulty but you never know.

 

Really wanted to finish this work on Friday so I had a week playing with Sharepoint and tidying up my office. ho hum

Posted
Well I've had a fun day. Hired the ICT Suite out to the Guides Association so I was able to come in and claim overtime. Managed to get loads done that I would normally do unpaid. :) and they left the place spotless.
Posted
I do it because I enjoy it and its nice to have a break from sat at a computer all week, I always do the cabling here except when we have a full refit then the sparky does it.

 

my sentiments exactly. If i wanted a job where i sit at a screen all day, save for the odd trip to the water cooler or the office copier, then i'd have no problem finding a job to reward me for being a serious IT person. ;)

 

As it is, i love getting my drill out from time to time and getting my hands dirty. so good for you.

 

and then you go on ruin it, by giving up. wimp. ;0) i know what you mean though....sometimes it's just easier to get someone in if the job becomes less about variety and more about hassle.

Posted
I've changed my mind, get people in :)

 

I only had one full reel and all but one cable doesn't work. I did rush and do it on Friday but the cables seem fine. Going to buy myself a tester and check the cables when I am back in next week. Can't believe the reel was faulty but you never know.

 

Really wanted to finish this work on Friday so I had a week playing with Sharepoint and tidying up my office. ho hum

 

Damn you, you've just proved bossman's point! ;)

 

Have done the odd few points.. but don't make a habit of it. It really isn't cost effective when it all goes tits up.

 

Kyle

Posted
Tend to do all my own work, much easier for me to do it and breaks up the other work we have to do :) Also going to do my own fibre work as pre-terminated stuff is cheap enough now and if your careful which I will be having dealt with it before it should be good :)
Posted

We always get a company in to do our data points. They charge by the day and not per point, so it costs as long as they think it's going to take. They're very efficient, I've had them do quite a lot of work in the 8 months I've been at the school, jobs that would have taken me weeks are completed by them in a few days to a good standard, and the best bit is that all the work is tested and guarunteed for 15 years by the company, so any problems they come back and fix it! They also give me a copy of the teste data for my records. :)

 

Mike

Posted
We always get a company in to do our data points. They charge by the day and not per point, so it costs as long as they think it's going to take. They're very efficient, I've had them do quite a lot of work in the 8 months I've been at the school, jobs that would have taken me weeks are completed by them in a few days to a good standard, and the best bit is that all the work is tested and guarunteed for 15 years by the company, so any problems they come back and fix it! They also give me a copy of the teste data for my records. :)

 

Mike

 

Which company is it that you use out of interest?

Posted (edited)
Which company is it that you use out of interest?

 

The comanie's called ADM computing in Canterbury, literally just down the road from our school, but they'll goto pretty much anywhere in the Kent/Sussex area.

 

Welcome to ADM Computing - Complete IT Solutions in Kent - Microsoft Certified Gold Partner

 

Give Jason Bramley a call there if you're interested, and tell him Mike from Spires Academy recommended him. :)

 

Mike

Edited by maniac
  • Thanks 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



×
×
  • Create New...