zag Posted May 11, 2012 Posted May 11, 2012 (edited) I'm just building a new server rack so thought it might interest some people to keep a log. I also have a few questions. Its a dell 2420 Poweredge 24u Rack. The idea is to move all current servers virtualized into it over time. Equipment list - 4 x Poweredge R300, 16gb Ram, 500GB hard disk, Xeon cpu - 4 x Dell Extendable rack mount Rails - 2 x APC Smart UPS 3000va - 1 x Dell UPS 1920va - Dell 1U Keyboard/Video/Mouse - Dell 1U static equipment shelf - Netgear GS724T 24 port gigabit switch - Some cool neon lighting - Customized server faceplates Is there anything I'm missing before I start construction? Edited May 11, 2012 by zag
sted Posted May 11, 2012 Posted May 11, 2012 (edited) depending on the size of racking a 2nd person long enough power leads to reach wall sockets power bars for monitors or anything else not ups powered captive nuts and bolts for the switch / other gear mounted directly to the uprights label maker Edited May 11, 2012 by sted 1
timzim Posted May 11, 2012 Posted May 11, 2012 Put the shelf about 20cm from the top then you can use it to dry your damp trainers and/or keep your pizza warm.
zag Posted May 11, 2012 Author Posted May 11, 2012 (edited) power bars for monitors or anything else not ups powered captive nuts and bolts for the switch / other gear mounted directly to the uprights Got a link for those captive nuts from anywhere? Thats the first problem I've come up against, nothing to screw into!! Also need a good looking power bar. The more flashy lights the better Heres first pic before its all built: Edited May 11, 2012 by zag
sted Posted May 11, 2012 Posted May 11, 2012 no i just go to the cupboard and take a box (dont work direct for a school work for a support company) but id suspect scewfix do them or failing that ebay lol
jamesfed Posted May 11, 2012 Posted May 11, 2012 If you have the cash maybe a enviromental monitor (temp/airflow/humidity).
plexer Posted May 11, 2012 Posted May 11, 2012 HellermannTyton Rack Snaps Cage Nut Insertion/Removal Tool Ben
nicholab Posted May 11, 2012 Posted May 11, 2012 HellermannTyton Rack Snaps Cage Nut Insertion/Removal Tool Ben They are so useful!!
sted Posted May 11, 2012 Posted May 11, 2012 They are so useful!! how on earth does that removal tool work i know its a pita getting them out and can end up with sliced fingers when the driver slips
sonofsanta Posted May 11, 2012 Posted May 11, 2012 Virtual Insanity: Part One - Lets Get Physical - Blogs - EduGeek.net
pete Posted May 11, 2012 Posted May 11, 2012 Plasters (or superglue) for when the cage nuts/that unfinished edge you managed to slide your finger across take their tithe of blood. Roll of velcro.
plexer Posted May 11, 2012 Posted May 11, 2012 Get some patchgrip for bundling cables fantastic stuff. Ben
nicholab Posted May 11, 2012 Posted May 11, 2012 Also it works well to have power on one side of rack and data on another. Colour code your Ethernet cable for different things.
gshaw Posted May 11, 2012 Posted May 11, 2012 More RAM for your vhosts PDUs coming off the UPS Environmental monitoring unit Colour coded cables at the correct length Dymo labeller Cable labels, either those little tag ones or sharpmark wrap around type http://www.sharpmark.com/Cable-labels Double sided velcro for tying up cables 1U Cable management arms 1
zag Posted May 11, 2012 Author Posted May 11, 2012 Are the drives hotswap? No, standard 1 internal 500gb drive in each. I'm figuring since they are virtualised I can just move them to a different machine if they ever fail.
newpersn Posted May 11, 2012 Posted May 11, 2012 No, standard 1 internal 500gb drive in each. I'm figuring since they are virtualised I can just move them to a different machine if they ever fail. Wouldnt you need 2 disc over a raid? (if i worded that right)
gshaw Posted May 11, 2012 Posted May 11, 2012 Hyper-V or VMware? We run our ESXi hosts on SD cards as the config is so minimal there's no point spending money and power on hard drives. Can't do a sub 50MB install with Hyper-V (yet) though
zag Posted May 11, 2012 Author Posted May 11, 2012 Battery Backup Units are in Damn those things heavy!!
netmgr001 Posted May 11, 2012 Posted May 11, 2012 it looks like you need to go round the back of the nut and squeeze. I had a removal tool which shipped the hp racks which works from front and is very effective. Still a bit fiddly, but less risk of hurting yourself. another vote for the color coded patch cables, i made the mistake of going down the route of same colored cables, and gave up trying to color code each end afterward.
DrPerceptron Posted May 11, 2012 Posted May 11, 2012 If you're clustering stuff, if you can get coloured velcro (or anything to differentiate) that's always handy for seeking out the correct set of cables to unbundled when you need to add/remove any cables to that box.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now