Feels so much better when its done doesn't it?

 

I have rewired (patch leads only) 4 cabinets since summer and replacing 2 (at an unknown time).

 

It takes up so much time but so worth it.

Posted
It feels great. Can actually see the servers and replace hard drives where necessary as apposed to moving loads of network cables out of the way. Took me 11 hours. Someone had put the cables to the patch panels through various slots at the back, so I ended up grinding the cabinet down !
Posted

that's a tower'z rack right? (42u is about 350 flat packed from ebay?) if so i've just put an identical rack in this weekend in a commercial premiss i support.

 

top tips -

plan plan plan and leave space for the unplanned.

short patch cables - i use 50cm but i interleave switch and patch panels. (switch, cable mgmt, patch, patch, cable mgmt, switch, repeat)

don't put things in the bottom 4u - it can make getting cables up a nightmare in the future if it's a 600mm wide rack.

always go for a rack that is 600 by 800 or bigger.

Posted
that's a tower'z rack right? (42u is about 350 flat packed from ebay?) if so i've just put an identical rack in this weekend in a commercial premiss i support.

 

top tips -

....................

short patch cables - i use 50cm but i interleave switch and patch panels. (switch, cable mgmt, patch, patch, cable mgmt, switch, repeat)

don't put things in the bottom 4u - it can make getting cables up a nightmare in the future if it's a 600mm wide rack.

 

+1

 

I was in the mind of having all switches at the bottom. But if you don't go mad on Edge switch cost a 1:1 patch port to switch port ratio laid out as this, with short cables is def the way to go.

 

We have 450 edge switches in total and are leaning to this config where ever possible now.

Posted (edited)

Before and after of a recent rewire we did. It was in this messy state when I started at this place.

 

[ATTACH]41098[/ATTACH]

IMG-20160803-WA0005.jpeg

IMG-20160803-WA0019.jpeg

Edited by FN-GM
Posted

Yes its a 37u cabinet.

 

Basically put 5 patches at the bottom, then 4 switches, then further 4 patches. Keep the wires to 50cm. The yellow ones are the phones, that are patched into a different switch. The majority of phones are on the top patch panel so I put that one nearest the phone switch

Posted

Nice jobs.

I'd love to rewire all ours and do a patch/switch/patch config. I know it is wasteful but is so much easier and to be fair, most our patch panels and switches are full so there wouldn't be that much waste.

Posted

Definitely neater - I assume patch panels went at the bottom because the runs had been done with the shorter cabinet in mind?

 

What's the blue glove on the ceiling for?

Posted
Definitely neater - I assume patch panels went at the bottom because the runs had been done with the shorter cabinet in mind?

 

What's the blue glove on the ceiling for?

 

smoke detector?

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



×
×
  • Create New...