I am setting up a new server for a school and I was wondering if it was possible to run the new server alongside the old one and then migrate everything over to the new one to reduce downtime?

 

Cheers

Posted

Before I had tried it / had the knowledge we used to install a new server from scratch. Man I'm glad those days are long gone.

 

What server os are you running on the old / new server?

Posted
It is very possible and I am doing something similar now, moving from 2008r2 to 2012 I have setup the new server with the same name adding the number 2 at the end and slowly moving one thing over at a time making sure each is working before I take it offline on the old server. Its working great so far.