Posted
Quote

Connections linking switches or switch stacks in hub rooms must connect back to the core server room using a minimum of 2x10Gbps with links taking different routes where possible.

 

What's everyone's interpretation of "where possible" in this standard? Does it apply to the whole standard or just the bit about diverse routing? We don't have diverse route cabling to every switch (does anyone?), so does that mean it's not possible therefore doesn't apply, or should I be looking to run a second cable to each edge switch (about 30 switches, in my case)? Does not being able to afford to do that also constitute it not being possible?!

 

As this is in the "network switching" category it is a core standard and therefore one we need to meet by 2030, but if it were in "network cabling" (which seems the more logical place for it), we'd only need to meet it when we replace our existing cabling.

Posted
1 hour ago, enjay said:

We don't have diverse route cabling to every switch (does anyone?)


I did when I was working in education - apart from 1 building as the geography didn't permit it.

Posted

it's rare but could be achievable in a compromise fashion by running uplinks to the next nearest switch. So as well as having a direct link to the core, you could also have a second link going to another switch which might also, at least partially, follow a different route.

But like you say, it's rare and something I'd expect to see only in new builds. CtC projects won't even cater for it.

Posted
11 minutes ago, synaesthesia said:

it ... could be achievable in a compromise fashion by running uplinks to the next nearest switch.

 

There's another standard which says "No intermediate splices or patch panels should be used in the cable runs". I suppose strictly-speaking that doesn't rule out daisy-chaining switches...

Posted

The primary would still be run to core, that just provides a realistic method of getting a semi-diverse route :)

Important thing to remember, these policies and recommendations are likely initially run through experts, then spend months going through committees who's main area of expertise is working a coffee machine rather than a switch ;) 

Posted (edited)
6 minutes ago, enjay said:

 

There's another standard which says "No intermediate splices or patch panels should be used in the cable runs". I suppose strictly-speaking that doesn't rule out daisy-chaining switches...


This rule is silly. Fibre is designed to be patched and spliced. In a data centre, It’s the norm for all fibre to be patched in a central location, this is to create direct connections between racks. It’s also common in large buildings and campuses connecting multiple buildings. It’s also his carrier networks are built. 
 

if a fibre cable is broken, it’s usually repaired with a splice. The whole run wouldn’t usually be replaced. 

Edited by FN-GM
Posted

Agreed, although there are good ways and bad ways to splice fibre. We have a building where a single 8-core was run in then split so 4 cores went to one data cabinet and the other 4 went to another cabinet in the room immediately above it! I spent a long time looking for the second cable before I worked out what had been done (no diagrams, of course).

 

Posted (edited)

"Where possible" caveat refers to the diverse route only. I expect there to be many arguments about what "possible" means. If the higher-ups didn't put enough money aside for a second route, does that make it "not possible"?  Certainly not, but they will argue it does, and unless you've got some leverage or an architect/consultant with letters after their name (who is not prepared to have their name against that poor decision),  they will win that argument. 

 

Patching fibre between panels/locations to create a logical network that does not resemble the physical network, I am told is pretty common practice in large non-edu buildings, so it is a bit odd to see a prohibition in the DfE spec -  but perhaps their motivation is the knowledge that the fibre in the school estate is mostly not even OM3, so patching  would pretty much guarantee that 10Gb would not be achievable?  Also that topology is fine if you've got 24 core fibre, but if the D+B team cheaped-out on say 8 core, you very quickly run out of resilience if a pair become damaged, and making sure a resilient logical topology is not undermined by the reality of the physical topology is quite a lot to get your head round, particularly if you're the third NM in the seat looking at a network that was designed 15 years ago.  See also: 

 

Edited by psydii
another thread on edugeek points to why patching together fibre runs might be discouraged in school settings.
  • 2 weeks later...
Posted

Practically yes. Pedantically, no (probably).

 

CORE -10G- Cab1 -10G - Cab2 -10g- Cab3 - 10G - CORE

 

If the fibre between core and cab1 fails, then all the traffic from CAB1 CAB2 and CAB 3 have to use CAB3's 10G link back to the core, which arguably now isn't providing any of the cabinets a 10G link, but a 1/3 share (if things are very busy).

 

We occasionally have events that cause similar failure modes. We only notice because the dashboard sends out alarms.  10Gb for the *entire* network to the core is more than enough.  (unless we're trying to image more than one IT Suite at  a time - but we've not needed to do that for a decade or more now).

 

(obviously if you have  40Gb to the core, and similar to your server/storage infra you might have set up end user working practices that really use 10Gb+ in which case you already have a better network design than DfE spec!)

 

Posted
On 09/11/2026 at 13:07, enjay said:

 

There's another standard which says "No intermediate splices or patch panels should be used in the cable runs". I suppose strictly-speaking that doesn't rule out daisy-chaining switches...

Surely this is impossible as you are meant to go from internal to External fibre, so how do you do that without a splice? or do they mean a join mid cable?  Not using patch panels seems a bit overly resticive too.

Posted
32 minutes ago, TechMonkey said:

Surely this is impossible as you are meant to go from internal to External fibre, so how do you do that without a splice? or do they mean a join mid cable?  Not using patch panels seems a bit overly resticive too.

 

I think it means both - no joins mid-cable, but also no instances of patch panels being used to link one fibre to another.  For example, we have one cable run where a 12-core fibre goes from A to B, where 4 of them terminate for the switch in Cab B, while the others loop across the same patch panel and then to two 4-core cables which go to Cabs C and D. These loops obviously cause loss (especially if one of the fibre is OM3 and the other OM4!) and means that Cabs B, C and D are all on the same fibre to the server room but as you say, a blanket "no" on any such daisy chaining seems overly restrictive.

Posted
21 minutes ago, enjay said:

 

I think it means both - no joins mid-cable, but also no instances of patch panels being used to link one fibre to another.  For example, we have one cable run where a 12-core fibre goes from A to B, where 4 of them terminate for the switch in Cab B, while the others loop across the same patch panel and then to two 4-core cables which go to Cabs C and D. These loops obviously cause loss (especially if one of the fibre is OM3 and the other OM4!) and means that Cabs B, C and D are all on the same fibre to the server room but as you say, a blanket "no" on any such daisy chaining seems overly restrictive.

 

ive done it where it rooms have been removed and a switch isnt required in location B but b used to be the inbetween for A/C... i mean if we were recabling i wouldnt do it again but gotta work with what youve got!

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



×
×
  • Create New...