Why would you do that? You really shouldn't need to.

 

As far as I'm aware you would see no benefit. If your routing is configured correctly on your core switch and you have a couple of DCs replicating correctly you should have all the fault tolerance and high availability you need (depending on the size of your network).

Edited by Gardinho
Posted
Why would you do that? You really shouldn't need to.

 

As far as I'm aware you would see no benefit. If your routing is configured correctly on your core switch and you have a couple of DCs replicating correctly you should have all the fault tolerance and high availability you need (depending on the size of your network).

 

Just wanted to know.

 

Few years ago we had someone come in and move us away 10.7 range. The company who done it for us, installed a virtual DC on eacher VLAN (Each server doing DNS,DHCP and AD)

Posted

Would love to know why they'd do that. I didn't think you'd need to. I may well be wrong though.

 

Have you ditched all the 10.7 addresses? Was it for local address expansion?

  • Thanks 1
Posted
Would love to know why they'd do that. I didn't think you'd need to. I may well be wrong though.

 

Have you ditched all the 10.7 addresses? Was it for local address expansion?

 

More security than anything. I'll find the topic about swgfl and there firewall.

 

We have the 10.7 coming in. Meets a Cisco NAT. (Need to check this). All routing is done though this (exchange, rpd and proxy's)

 

I thought it was overkill. But heyho

Posted
Were SWGFL involved with this work? Definite overkill! Do you use them for your internet services?

 

Nope. We just use them for our Internet services.

Posted
Seems like a ridiculous idea to me. I can understand the NATing, it does add a division between your network and the SWGfL, but the DCs thing just seems plain odd.
Posted

Or someone who wanted to play around with the features of AD Sites and Services, perhaps ahead of bidding for work on a genuine multi site project.

 

Done properly it should cause no harm, provided the next admin in also understands the site and services elements of AD design and management.

 

/optimist

  • Thanks 1
Posted

7 years ago, when i was still quite new to all this we had someone come in and do the exact same thing. This was before virtualisation became a big thing i think, but we ended up having a physical low powered DC in each building (so not every vlan as such, but every physical building) which resulted in us having 5 or 6 physical DCs spread throughout the site. Very similar to what you've got from the sounds of it.

 

Basically as time went on i noticed it being more and more of a waste of space, no idea why it was done like that. Now we just have two DCs and a replication to azure AD, no need for all those others, it was very excessive and overly complicated and a waste of resources.

 

I'm sure the company that did it had their reasons, maybe based off information the manager gave them perhaps, as i still know the people who work there and they aren't by any means stupid. (I'm sure there must be a legitimate reason if two different companies did the same/similar thing for two different schools. I wonder if it was common for that type of setup when you were doing vlans but had no server virtualisation to work with perhaps.) Definitely a position i'd recommend moving away from now though. simplify your setup, free up resources etc. :)

 

EDIT: Hold on a minute, location gloucestershire, i wonder if it was the same company! One in stonehouse business park per chance? starts with a j?

Posted
7 years ago, when i was still quite new to all this we had someone come in and do the exact same thing. This was before virtualisation became a big thing i think, but we ended up having a physical low powered DC in each building (so not every vlan as such, but every physical building) which resulted in us having 5 or 6 physical DCs spread throughout the site. Very similar to what you've got from the sounds of it.

 

Basically as time went on i noticed it being more and more of a waste of space, no idea why it was done like that. Now we just have two DCs and a replication to azure AD, no need for all those others, it was very excessive and overly complicated and a waste of resources.

 

I'm sure the company that did it had their reasons, maybe based off information the manager gave them perhaps, as i still know the people who work there and they aren't by any means stupid. (I'm sure there must be a legitimate reason if two different companies did the same/similar thing for two different schools. I wonder if it was common for that type of setup when you were doing vlans but had no server virtualisation to work with perhaps.) Definitely a position i'd recommend moving away from now though. simplify your setup, free up resources etc. :)

 

EDIT: Hold on a minute, location gloucestershire, i wonder if it was the same company! One in stonehouse business park per chance? starts with a j?

 

I wouldn't want to give it away.... I'm just the technician. I think we will be looking at making it better. (all these are on VMWare)

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



×
×
  • Create New...