Hi all,
Just a quick question about the setup of aspects and resultsets within SIMS.
We currently have a mix match of both of the examples below, depending on key stage and what it is used for, which I would like to redo them so all are the same. But I'm wondering which is the correct way if we wish to use tracking grids etc which we do not currently use.
1.
Aspects:
Maths
Resultsets:
Capture1 - Current Level
Capture1 - Predicted Level
Capture1 - Effort
Capture2 - Current Level
Capture2 - Predicted Level
Capture2 - Effort
2.
Aspects:
Maths - Current Level
Maths - Predicted Level
Maths - Effort
Resultsets:
Capture1
Capture2
Or is there another way that I'm missing!?!
Thanks in advance