Hi Jen
In the Model tab increase the Minimum Periods to an extra 1 (for 1 period), go back to the block and schedule the extra period onto the day/period you want (when it comes up as Displaced Units Lock/Clash all), you can then either move an existing staffed/roomed period or staff/room the new period.
Hope this helps
Pam