Jobos Posted July 12, 2010 Posted July 12, 2010 One of my schools is upgrading from 2Mb to 10Mb broadband and I would like advice on where the new connection should go in relation to the network as there has been substantial changes since the last broadband install. The network consists of 3 cabs, A, B and C. Servers connect to the 1Gb core switch in cab A which also houses 3 1Gb switches. Cab B has 3 1Gb switches each connecting to core switch with 1Gb copper. Cab C has a single 100Mb switch connecting to cab B over copper. There are plans to fit an extra switch in cab C later in the year. BT will be installing the fibre and the easiest cab to get to from the road is cab C but I’m concerned that this won’t be the best place to make the connection.
CyberNerd Posted July 12, 2010 Posted July 12, 2010 It should be located in the Main Distribution Facility (MDF) - the cabinet that holds the backbone switches, - ie Cab A
powdarrmonkey Posted July 12, 2010 Posted July 12, 2010 If your outbound line is only 10Mb/s, a 100Mb/s copper to it doesn't make any difference at all...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now