We run with 8 periods a day. Lesson 1 is 35 mins long, Lesson 2 is 40 mins long, Lesson 3 is 35 mins long etc etc etc
In order to use the analysis reports accurately to see how much time has been allocated to a member of staff I would like to be able to reflect this in Nova.
Is it possible and, what is the default amount of time used by the system?
Many thanks
Pippa