Jump to content

goclone

Members
  • Posts

    5
  • Joined

  • Last visited

Reputation

0 Neutral

About goclone

  1. I half to agree with maniac get the training you need to get the job done it will make things go a lot easer. Also look into software that will make it easer to set up all the computers. I did a major deployment of computers last year (250) and was fortunate enough to have Norton Ghost to avoid having to install programs on etch computer, there are other programs that do the same thing some better some worse it just depends upon how much money you could spend if any at all. I also set each student up with a login for active directory for the first time in my district using a CSV import (http://www.computerperformance.co.uk/Logon/Logon_CSVDE_secrets.htm). Of course this is only a viable option if you have all the relevant information in digital format. If not you will need to put them into active directory by hand. Also as I have told all of the techs at our schools don’t be afraid to try something. This is the best way to learn technology is to do it. If possible build a sand box (small simulation network to avoid damage to the active network). But always try
  2. Ok I know this should be simple but I haven’t had to deal with it before. I have a server I just set up with win2003 R2. I set up the program that it is to run. And now that it is all up and going I can not get it to connect the share to all the computers. It should connect with a login .bat file but will only do so for the first dozen computers ore so then I try to manually map the drive and I can get another 3 or 4 to connect. Then it gives me an error that the maximum number of connections has been reached. I assume this has something to do with the license that it has. Though it should be the same as the rest of the servers we have under a volume license that is working fine. Any ideas P.S. just found this site last week or so and I love it. Thanks for all the info
×
×
  • Create New...