Kyle Posted June 4, 2008 Posted June 4, 2008 I have several NT Backups running which when set up were set to append. We now want them to be set to overwrite. When i open the existing back up i can't seem to find out how to change the setting to overwrite. The only thing i have done so far is delete the original back up job and re-create it from scratch and i don't want to do this on all of them hence this post? Any ideas?
craiglay Posted June 4, 2008 Posted June 4, 2008 Have a read through: Microsoft Corporation Try going into scheduled jobs, you'll see its just running ntbackup.exe with a lot of command switches. I guess you'd just remove a "/A" to perform a normal backup. As always, keep a backup of the original job, and test.. No responsibility here for breakages. Craig