twin--turbo Posted October 22, 2013 Posted October 22, 2013 I finished putting our Dell (EMC) clarrion back onto service today. nicely redundant. 2 storage processors, twin lan on each, connected to twin edge switches with twin redundant links back to the redundant cores. 4 way mulitipathing on the san. this is for our old dell 2950s running Xenserver. We were relying on 1 Xenserver to host our Exchange , with only local storage. Now we have 2 xenservers reliable shared storage and so the ability for one server to blow up and for us to keep on going. Currently on the old version of xen server so the process is a manual restart on the server on the second hypervisor but it's a big improvement. Need to upgrade the servers to the later Xenserver for High Availability.. Rob
glennda Posted October 23, 2013 Posted October 23, 2013 Hi, Just to put my two pence in, we have just been through a similar process of evaluating which SAN to purchase, we have around 8 Hyper V hosts all with local storage and really wanted a large amount of storage (when does it stop growing!) and some redundancy in terms of Hyper V hosts - we looked at Dell, HP and then came across (through edugeek of course!) Nimble. HP fell through pretty quickly based on the timeframe to just get a quote from them. Dell was a very close second and we liked the idea of single vendor but didn't want to be held back by that idea (we also purchased 2 x R620's with 256GB RAM in each for a new Hyper V cluster, along with 2 x Dell 6248 switches to be dedicated to the SAN switching - the R620s are extremely power efficient compared to our old PE2900's and even the R710's - not to mention going from 5U to 1U!), I had some very good conversations with Matt from Nimble (with plenty of questions from me) and ultimately we chose them, I think the key for us was to look very closely at what was actually being offered by each vendor in terms of performance in real terms as well as accessing future growth and needs (possible VDI etc.), for us there was a clear winner! We went with a single CS240 (unfortunately our budget wouldn't allow for 2!), which means that we will leverage snapshots for short term backups but will keep DPM and some very large NAS boxes and tape library going for long term/disaster recovery). We haven't received it yet, so will try to update how we get on when it arrives, but really looking forward to putting it through it paces and checking out infosight. I'm in Devon, but if anyone wants to see it in action (when we've got it in and running of course) or have a chat feel free to PM me. You should get this just in time for 2.0 to be released fully and you will get a 20% performance boost within 10 mins to taking it out the box!
jamesrhart Posted October 23, 2013 Posted October 23, 2013 You should get this just in time for 2.0 to be released fully and you will get a 20% performance boost within 10 mins to taking it out the box! Glad to hear it, I've just had the tracking through so hopefully it won't be too long, will make sure to upgrade straight away.
glennda Posted October 23, 2013 Posted October 23, 2013 Glad to hear it, I've just had the tracking through so hopefully it won't be too long, will make sure to upgrade straight away. It goes completely available in the next couple of weeks.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now