    Summer Project

    As our minds now focus on a lovely 6 week or so break from Teachers we find ourselves thinking - 'What are our summer plans'

    New Server Builds
    Maintenance
    Upgrades
    Re-Imaging
    Networking

    and the list goes on...

    My question is - What are your summer plans?
    Last edited by pettit87; 5th June 2012 at 11:47 PM.

  2. #2
    jstuttard's Avatar
    Join Date
    Nov 2009
    Location
    Northamptonshire
    Posts
    151
    Thank Post
    9
    Thanked 29 Times in 23 Posts
    Rep Power
    15
    My list is:
    - Add another Server to replace the job of 6. Using Hyper-V.
    - Getting & Image 30 Intel Classmates
    - 9 SMART Boards
    - Replacement Core Switch

  3. Thanks to jstuttard from:

    zag (18th June 2012)

  4. #3

    FN-GM's Avatar
    Join Date
    Jun 2007
    Location
    UK
    Posts
    16,374
    Thank Post
    906
    Thanked 1,811 Times in 1,559 Posts
    Blog Entries
    12
    Rep Power
    468
    We have having a section of the school knocked down, this means relocating cables. We are moving some off our servers in one server room into the other one, in preparation for when that area is knocked down.

  5. #4
    dgsmith's Avatar
    Join Date
    Nov 2007
    Location
    Merseyside, England
    Posts
    1,111
    Thank Post
    119
    Thanked 90 Times in 78 Posts
    Rep Power
    37
    Quote Originally Posted by pettit87 View Post
    My question is - What are your summer plans?
    Fundraise the money to even consider projects! We've love managed wireless and a new ICT suite mainly, but it seems we're out of luck again, for the 4th year running..

    Quote Originally Posted by FN-GM View Post
    We have having a section of the school knocked down, this means relocating cables. We are moving some off our servers in one server room into the other one, in preparation for when that area is knocked down.
    Are you back in the UK now then or still down under?

  6. #5
    wagnerk's Avatar
    Join Date
    Jun 2007
    Location
    Northants
    Posts
    822
    Thank Post
    65
    Thanked 169 Times in 137 Posts
    Rep Power
    48
    We've got a bit going on (server migrations, PC rebuilds, etc), however the project that we're excited about is VDI. We're in the process of starting it now to two rooms, then expand...

  7. #6

    synaesthesia's Avatar
    Join Date
    Jan 2009
    Location
    Northamptonshire
    Posts
    6,515
    Thank Post
    627
    Thanked 1,173 Times in 900 Posts
    Blog Entries
    15
    Rep Power
    524
    Removal of CC3, from scratch implementation of a vanilla+sccm2012 install, as well as new PC (self builds) and some major network testing

  8. 2 Thanks to synaesthesia:

    mburland (28th June 2012), zag (18th June 2012)

  9. #7

    Join Date
    Jun 2010
    Posts
    400
    Thank Post
    37
    Thanked 58 Times in 55 Posts
    Rep Power
    33
    Most likely a MAC suite for music and iPads distributed through depts. that have asked for them. Few bits of software to deploy for next year, but that's about it.

  10. #8

    Join Date
    Oct 2005
    Location
    mnah mnah!
    Posts
    1,126
    Thank Post
    275
    Thanked 227 Times in 173 Posts
    Rep Power
    113
    Quote Originally Posted by pettit87 View Post
    As our minds now focus on a lovely 6 week or so break from Teachers we find ourselves thinking - 'What are our summer plans'

    New Server Builds
    Maintenance
    Upgrades
    Re-Imaging
    Networking

    and the list goes on...

    My question is - What are your summer plans?
    Remove CC3 and replace with a vanilla network infrastructure and install Windows 7 on 1500 or so PCs.
    Upgrade numerous servers to win 2008r2
    Hopefully fix our Bloxx deployment.
    Upgrade firmware on all our switches
    Convert science rooms to normal teaching rooms with PCs in them.
    Convert teaching rooms to science rooms (Yes, I do realise what I said in the line above this. No I don't want to talk about it)
    Install new TV signage system

  11. Thanks to Roberto from:

    mburland (28th June 2012)

  12. #9

    Join Date
    May 2011
    Location
    Jus North of London, close but not too close
    Posts
    912
    Thank Post
    202
    Thanked 80 Times in 74 Posts
    Rep Power
    52
    1. Fresh new Image build
    2. Build another 2008 R2 DC/DNS/DHCP
    3. Try and re-work the SAN to store ESXi datastores
    4. New Email System and do all the MX records/firewall/ssl certificate etc.
    5. New Filtering/Proxy device
    6. New Wireless System with new PoE switches.
    6. Move the FSMO roles and demote the old 2003 DC.
    7. Re-Image 48 New Laptops
    8. Have plenty of tea and biscuits
    9. Deal with staff who insist on trying to use the system while we are trying minimise the downtime but still need to do the work.

    Apart from that not much really

  13. #10

    Join Date
    Feb 2008
    Location
    Wiltshire
    Posts
    905
    Thank Post
    287
    Thanked 141 Times in 114 Posts
    Blog Entries
    28
    Rep Power
    42
    1. New PCs and Re-Vamp of the Music Department - long over due.
    2. New ICT/GFX Suite Build - organising contractors, etc for Power, Data, A/C, etc, etc !
    3. AV Installs and shuffling of various Smartboards around the School.
    4. Introduce 64Bit Images around the School
    5. Drink copious amounts of tea
    6. Try and chill out abit

    Pete

  14. #11

    Domino's Avatar
    Join Date
    Oct 2006
    Location
    Bromley
    Posts
    4,126
    Thank Post
    217
    Thanked 1,353 Times in 826 Posts
    Blog Entries
    4
    Rep Power
    528
    Hide from the Olympics.

  15. 2 Thanks to Domino:

    john (16th June 2012), themightymrp (18th June 2012)

  16. #12

    Join Date
    Oct 2009
    Location
    The Netherlands
    Posts
    83
    Thank Post
    1
    Thanked 16 Times in 13 Posts
    Rep Power
    13
    Taking a long vacation, this should be on everyone list as number 1.

  17. #13

    Join Date
    Sep 2009
    Posts
    140
    Thank Post
    2
    Thanked 10 Times in 9 Posts
    Rep Power
    12
    Quote Originally Posted by gjdb View Post
    Taking a long vacation, this should be on everyone list as number 1.
    Should be, but in reality that's just for teachers

  18. #14

    teejay's Avatar
    Join Date
    Apr 2008
    Posts
    3,260
    Thank Post
    290
    Thanked 796 Times in 605 Posts
    Rep Power
    348
    Installing a high availability solution across 2 server rooms and an off-site location. I won't be getting a sun tan this year...

  19. #15
    jimmy_2k's Avatar
    Join Date
    Jun 2009
    Location
    Bristol
    Posts
    199
    Thank Post
    4
    Thanked 11 Times in 10 Posts
    Rep Power
    13
    Replacing our Active Directory with 2 new Server 2008R2 domain controllers. Reimage 600 workstations and rebuild the file server to Server 2008R2 with quotas and restructure the shared folders.



SHARE:
+ Post New Thread
Page 1 of 3 123 LastLast

Similar Threads

  1. Replies: 2
    Last Post: 29th May 2012, 02:04 PM
  2. Replies: 12
    Last Post: 3rd April 2012, 08:44 AM
  3. Summer projects...
    By Little-Miss in forum General Chat
    Replies: 84
    Last Post: 16th July 2009, 02:26 PM
  4. Project Ideas
    By russdev in forum Group Project
    Replies: 71
    Last Post: 27th June 2006, 06:18 PM
  5. Replies: 18
    Last Post: 11th July 2005, 10:19 AM

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •