+ Post New Thread
Results 1 to 4 of 4
MIS Systems Thread, Nova T6 printing timetable in Technical; Hi Our DH has just finished his timetable in Nova T6 but the problem we are having is when we ...
  1. #1
    HMCTech's Avatar
    Join Date
    Apr 2008
    Posts
    618
    Thank Post
    37
    Thanked 48 Times in 35 Posts
    Rep Power
    22

    Nova T6 printing timetable

    Hi

    Our DH has just finished his timetable in Nova T6 but the problem we are having is when we print it. The layout comes out without the days of the week in the top table. I try copying to file, a .txt file then opening with Excel however the same happens (that and it looks scruffy).

    What is the proper way to print in Nova T6 each indiciduals timetable?

  2. #2

    Join Date
    Mar 2007
    Location
    Heywood, Lancs
    Posts
    211
    Thank Post
    7
    Thanked 50 Times in 45 Posts
    Rep Power
    27
    I don't think there is an easy way of doing decent bulk printing in T6
    The print routines in T-6 are awful, but I suppose they are really intended for checking purposes rather than producing the final product.

    If you have a lot to do best I can suggest is create a new timetable directory in T-4, and change to that directory, transfer the timetable direct from T6 to T4 and then use the bulk printing routines in T4, which are much better. Should only take a few minutes, and won't bugger up your 'live' T4 data.

  3. #3

    Join Date
    Nov 2006
    Location
    Kendal
    Posts
    1,555
    Thank Post
    112
    Thanked 177 Times in 144 Posts
    Rep Power
    71
    Quote Originally Posted by AlexPilot View Post
    Hi

    Our DH has just finished his timetable in Nova T6 but the problem we are having is when we print it. The layout comes out without the days of the week in the top table. I try copying to file, a .txt file then opening with Excel however the same happens (that and it looks scruffy).

    What is the proper way to print in Nova T6 each indiciduals timetable?
    Assuming you have imported the T6 timetable into SIMS.net you can do Reports - print timetables in SIMS.Net

  4. #4
    HMCTech's Avatar
    Join Date
    Apr 2008
    Posts
    618
    Thank Post
    37
    Thanked 48 Times in 35 Posts
    Rep Power
    22
    Quote Originally Posted by jcollings View Post
    Assuming you have imported the T6 timetable into SIMS.net you can do Reports - print timetables in SIMS.Net
    No he has not done that.

SHARE:
+ Post New Thread

Similar Threads

  1. SIMS.Net & Timetable planning
    By Ravening_Wolf in forum MIS Systems
    Replies: 22
    Last Post: 4th November 2009, 03:27 PM
  2. exporting timetable info from Nova-T
    By Oops_my_bad in forum MIS Systems
    Replies: 6
    Last Post: 15th November 2007, 01:05 PM
  3. Replies: 1
    Last Post: 2nd March 2007, 03:10 PM
  4. printing issue in nova t 4
    By krisd32 in forum MIS Systems
    Replies: 3
    Last Post: 30th June 2006, 12:46 PM
  5. Curious printing issue in NOVA-T
    By Jake in forum How do you do....it?
    Replies: 2
    Last Post: 24th March 2006, 01:10 PM

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •