    What have YOU implemented?

    Just a quick question (with a possible lengthy reply).

    "What have you implemented at your school since you started?"

    Just looking for answers such as:

    ::: Zimbra email system
    ::: Upgrade to 2003/08 servers
    ::: CC3 --> CC4

    That kind of stuff as well as anything that's out of the ordinary i.e.

    ::: Digital Video Vault etc

  2. #2

    garethedmondson's Avatar
    Join Date
    Oct 2008
    Location
    Gowerton, Swansea
    Posts
    2,258
    Thank Post
    962
    Thanked 324 Times in 192 Posts
    Blog Entries
    11
    Rep Power
    164
    Quote Originally Posted by Hightower View Post
    Just a quick question (with a possible lengthy reply).

    "What have you implemented at your school since you started?"

    Just looking for answers such as:

    ::: Zimbra email system
    ::: Upgrade to 2003/08 servers
    ::: CC3 --> CC4

    That kind of stuff as well as anything that's out of the ordinary i.e.

    ::: Digital Video Vault etc
    Well since I started as an ICT Teacher in 1998 before the days of technicians (and even now in the days of technicians)...

    1. Upgrade of RM Connect Foundation through it's versions to CC3
    2. Nightmare of an install with SR4 on CC3
    3. Complete new network after leaving RM
    4. Installation of a RIS Server (with technician)

    I'm sure there is more, but cannot remember the past 10 minutes never mind 10 years.

    GJE

  3. #3
    contink's Avatar
    Join Date
    Jul 2006
    Location
    South Yorkshire
    Posts
    3,791
    Thank Post
    303
    Thanked 327 Times in 233 Posts
    Rep Power
    118
    -> 3 - 5 year budget plan
    -> low cost printing systems
    -> replacement of 15 different machine types for 2 or 3 at most
    -> RIS & GPO OS/software deployment
    -> user accounts for every child
    -> automated archiving and organisation of childrens work through AD & login script system

    ... the list is long...

  4. #4

    Join Date
    Mar 2007
    Location
    Devon
    Posts
    1,041
    Thank Post
    225
    Thanked 63 Times in 56 Posts
    Rep Power
    29
    Well i'll start with a network.... then everything that goes with that....

  5. #5
    pooley's Avatar
    Join Date
    Sep 2005
    Location
    S Wales
    Posts
    1,128
    Thank Post
    77
    Thanked 118 Times in 99 Posts
    Rep Power
    66
    Network
    2003 Servers
    Exchange Server
    Radius Server
    2 x Mac Suites

  6. #6

    Join Date
    May 2008
    Posts
    56
    Thank Post
    33
    Thanked 3 Times in 3 Posts
    Rep Power
    13
    • Creating an updating improved school website
    • Removing old computers running Windows 98
    • Replacing them with custom built PC's made by myself running Windows XP
    • User accounts for each member of staff.
    • User accounts for pupils year 1 to year 6.
    • Removing old server running Windows Server 2000
    • Replacing with server running Windows 2003
    • Implementing a Service Desk for submitting and tracking requests
    • Implementing a support blog to keep staff up to date regarding whole school issues

    All I can think of at the moment

  7. #7
    Friez's Avatar
    Join Date
    Dec 2006
    Posts
    839
    Thank Post
    22
    Thanked 22 Times in 21 Posts
    Rep Power
    23
    Developed school intranet from scratch.
    Switched over to a totally new network including massive amounts of new XP clients.
    Added a new wireless system to the school.
    New email system (Exchange) plus email for everyone on (and off!!) site.
    Installed IWB's to every classroom.
    Implemented loads of admin tools including mass-logon, shutdown, remote controllers, user tracking e.t.c.
    Set up a Creative Technology Suite including a large steroscopic display, 30 laptops, 19 clients and video conferencing kit.
    Obvious stuff like a user account for everyone on-site, upgrading stuff e.t.c.

    Definitely WAY more than this, don't have enough time to list EVERYTHING!

  8. #8
    button_ripple's Avatar
    Join Date
    Dec 2007
    Location
    Luton
    Posts
    346
    Thank Post
    93
    Thanked 20 Times in 18 Posts
    Rep Power
    17
    Linking 2 buildings together w/h fibre optic
    Setup of all equipment from scratch
    Installation of 2 servers
    Setup of 2 more servers
    Move admin from a workstation server to proper server
    Update all equipment that was 7 years old (everything!!)
    Get printers available to all staff

    List goes on and on!!

  9. #9
    User3204's Avatar
    Join Date
    Aug 2006
    Location
    Wirral
    Posts
    769
    Thank Post
    55
    Thanked 66 Times in 62 Posts
    Rep Power
    34
    Hmm..
    • Upgraded Client OS - Windows 95 > 98 > 2000 > XP;
    • Upgraded Server OS - Windows NT 4 > 2000 > 2003;
    • Introduced Group Policies, etc etc, and this stopped all the games;
    • Managed rollout of Site-wide Wireless;
    • Managed rollout of Data-Projectors to all classrooms - took responsibility for data projectors when AV tech moved on;
    • Upgraded Fibre backbone from 10mbit > 100mbit > (some 1gbit);
    • Replaced all Hubs with switches, am still upgrading to Managed Switches;
    • Introduced the concept of site-wide Anti-virus/ Anti-Spyware - Installed it
    • Upgraded Mailserver, and contracted maintenance support, gave all staff proper/standardised emails, gave students email addresses too;
    • Introduced procedure for adding new staff (with DH) - we still need to develop a leaving one mind;
    • Installed various site-wide software for education, typically: QCA KS3 testing, UCAS EAS;
    • Introduced relevant security to the shared drives;
    • Automated new user creation;
    • Backed up servers, and created a policy to continue;
    • Increased storage on main user file server from 4*9gb > 4*18gb > 4*36gb > 8*147gb (never again) [all RAID5];


    Off the top of my head.

    Oh, and increased the dept from me plus two Teachers to 3 plus one Teacher.

  10. #10

    powdarrmonkey's Avatar
    Join Date
    Feb 2008
    Location
    Alcester, Warwickshire
    Posts
    4,859
    Thank Post
    412
    Thanked 777 Times in 650 Posts
    Rep Power
    182
    Since I started in June? Every server virtualised; nagios-type printer monitoring; one-touch deployment process; and probably a lot more that I can't think about while I'm on holiay.

  11. #11
    joe90bass's Avatar
    Join Date
    Oct 2007
    Location
    S Wales
    Posts
    1,349
    Thank Post
    322
    Thanked 107 Times in 96 Posts
    Rep Power
    50
    NT4 server > 2003 > currently implementing 2008
    Anti-virus throughout
    Managed Wireless rollout
    helpdesk
    NT workstation > 2000 > xp > now part Vista (yeh I braved it!!)
    Exchange Server with e-mail for all staff and sixth form - soon to be all pupils
    Music Suite


    All I can think of at the moment, must be more I've been here 6 years!

  12. #12

    webman's Avatar
    Join Date
    Nov 2005
    Location
    North East England
    Posts
    8,400
    Thank Post
    636
    Thanked 961 Times in 661 Posts
    Blog Entries
    2
    Rep Power
    319
    Personally...

    • Set up linux proxy server (suse, then ipcop)
    • Set up linux email server (postfix+imap+squirrelmail) with remote access
    • Set up linux file servers (centos)
    • Developed web-based intranet with helpdesk
    • Developed website
    • Wake-on-LAN schedule (custom) and auto-shutdown (CC3)
    • Developed a web-based room booking system
    • Implemented a wiki and knowledge base
    • Developed internet and email on/off button teacher tools for lesson control in ICT suites
    • Implemented remote desktop viewing/control tool for teachers in ICT suites
    • Upgraded email server to Zimbra (and developed single sign-on/preauth launcher)


    On a whole and as a team (mainly bossman & I), we have moved from RM 2.4, installed a 10gig fibre backbone and loaded it full of Cisco switches, implemented and managed RM CC3, kitted out all rooms with Promethean IWBs and trained staff on the use of them, created 5+ cross-curriculum ICT suites with mono/colour laser printers, migrated from separate admin/curric networks to one single platform, a helpdesk, atleast one PC per classroom (no laptops for IWBs), electronic registration (SIMS Lesson Register), upgrade hardwares etc etc...
    Last edited by webman; 21st October 2008 at 12:09 AM.

  13. #13
    torry_loon's Avatar
    Join Date
    Apr 2008
    Location
    Aberdeen
    Posts
    31
    Thank Post
    4
    Thanked 8 Times in 7 Posts
    Rep Power
    14
    • Extended the network to cover most of the school
    • Implemented proper network security
    • Upgraded all computers to Windows XP
    • Gutted & rebuilt the ICT suite
    • Replaced the reporting systems using MS Word/Excel with PHP/mySQL
    • Replaced old pupil database
    • Migrated to OpenOffice & Open Document
    • Installed Ubuntu on all computers used by the children
    • Migrated servers from Windows 2000 Server to Ubuntu or Debian with LDAP, Samba, Apache etc.
    • Replaced SurfControl with Squid/SquidGuard
    • Implemented FTP access to home directories

  14. #14

    localzuk's Avatar
    Join Date
    Dec 2006
    Location
    Minehead
    Posts
    17,528
    Thank Post
    513
    Thanked 2,405 Times in 1,862 Posts
    Blog Entries
    24
    Rep Power
    822
    * Set up school website, including school shop
    * Set up school intranet site
    * Set up helpdesk (glpi, then RT)
    * Set up MRBS
    * Set up Nagios, Cacti and OCS-NG
    * Set up Asterisk server + 40ish extensions
    * Wrote a phonebook for above, including pulling details from SIMS.net
    * Increased computer count in school from 150 computers to around 290
    * Introduced ABTutor control
    * Replaced all unmanaged switches with HP 2600 series managed switches, including switching to a 1Gbps backbone infrastructure.
    * Introduced device authentication (mac based) using IAS (radius) and AD
    * Introduced wireless in certain places around the site
    * Replaced wireless PTP system for 2 of our huts with fibre
    * Introduced electronic displays in our foyer, year 5 block and outside our canteen.
    * Introduced a citrix based thin client system in one suite, and just recently for 8 admin machines
    * Oversaw the relocation of the network core and server placement to a new room with A/C.
    * Introduced 7 mac's and a os x server (on a mac mini) to provide network authentication
    * Introduced the concept of producing cd's en-mass in school (such as a prospectus cd) and purchased a robotic duplicator to do this.
    * Introduced staff proximity ID cards, produced in house (paxton door system).
    * Planned, and oversaw the movement of 1 ict suite to a new room, and 2 other suites being completely refurbished.
    * Replaced most of our cabinets to fit larger switching gear.
    * Implemented video conferencing with our feeder first schools (on going, final stages)

    There's probably more. I've been in post for 2 years 4 months.

  15. #15
    steve_nfi's Avatar
    Join Date
    Nov 2007
    Location
    Central London
    Posts
    290
    Thank Post
    149
    Thanked 24 Times in 20 Posts
    Rep Power
    18
    Nothing apart from having a Cisco wireless solution installed.
    IT manager to scared of change.
    All my time spent fire fighting and moving data around.
    Driving me round the bend.
    Anyone got a job?

SHARE:
+ Post New Thread
Page 1 of 2 12 LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •