General Chat Thread, A challenge in General; In a discussion with a friend (a Data Centre Manager) about how different school servers can be from school to ...
  1. #1

    GrumbleDook's Avatar
    Join Date
    Jul 2005
    Location
    Gosport, Hampshire
    Posts
    9,935
    Thank Post
    1,341
    Thanked 1,784 Times in 1,107 Posts
    Blog Entries
    19
    Rep Power
    595

    A challenge

    In a discussion with a friend (a Data Centre Manager) about how different school servers can be from school to school we hit on trying to see what a typical server room looked like, and whilst he enjoyed looking at the server room thread he wanted more quantifiable information ... so to settle a disagreement would folk care to answer the following?

    1. What type of school are you? (S - Secondary including Upper schools, P - Primary, M - Middle, J - Junior, I - Infants, N - Nursery, O - Other and please add SP if special provision or ALT for Alternative education such as PRU)
    2. How many learners do you have?
    3. Approx dimensions of your server room
    4. Is your server used for any other task (e.g. office, storage, etc)?
    5. Was your servers room a conversion (eg no - dedicated room, yes - previously a toilet)?
    6. How many Racks do you have?
    7. What make(s)?
    8. Dimensions (eg 19" x 42Ux 1200)
    9. How is your rack filled (e.g. 4U - UPS, 10U - servers, 5U - switches / routers, 4U - patch panels, 3U - Cable Management, 16U - spare / blank)
    10. How much power is available and drawn per rack (individual rack)?
    11. What is the BTU output of the equipment in your rack (individual rack)?
    12. What is the weight of your loaded rack?
    13. What is the max cooling load of your A/C (BTU/hr)



    If you don't know any of the answers then just say "Don't know" ...

  2. #2

    tmcd35's Avatar
    Join Date
    Jul 2005
    Location
    Norfolk
    Posts
    5,665
    Thank Post
    850
    Thanked 893 Times in 738 Posts
    Blog Entries
    9
    Rep Power
    328
    1 - Secondary
    2 - 850
    3 - 2m x 4m (does that sound about right?)
    4 - Toner storage, Software, 2 filing cabinets of assorted stuff
    5 - Not sure, certainly a dedicated space now
    6 - 2
    7 - ?
    8 - Er, tall! floor standing, 19", probably 42U
    9 - Rack1 = 5-6U patch panels, 9U switches, 3U routers/servers, 6U UPS's, rest spare/blank
    Rack2 = 4U CCTV DVR, 1U KVM, 5U Servers, 6-8U UPS, rest spare/blank
    10 - Don't know
    11 - Don't know
    12 - Don't know
    13 - 2xA/C units - Don't Know specs

    (I may actually go look/measure and edit this post later - if I remember)

    Edit: I do have a 2U server sitting on top of the 2 filing cabinets (not sure I should be admitting to that, or the fact it's out main 4Tb storage array... )
    Last edited by tmcd35; 22nd November 2012 at 12:14 PM.

  3. Thanks to tmcd35 from:

    GrumbleDook (22nd November 2012)

  4. #3

    twin--turbo's Avatar
    Join Date
    Jun 2012
    Location
    Carlisle
    Posts
    2,334
    Thank Post
    1
    Thanked 381 Times in 340 Posts
    Rep Power
    150
    1) S
    2) 1100
    3) 6M*3M plus a 2M*2M alcove
    4) No (except some tonors)
    5) Built
    6) 5
    7) Excel
    8) 2x 19" x 42Ux 1000 / 2x 19" x 42U x 800
    9) Rack 1 Structured cabling and 1U switches
    Rack 2 2x4507 Cores , UPS, ASA, Firebox, Securus,
    Rack 3 UPS, Blade enclosure 5 1U Servers, 2 Lefthand Sans, 1 MSA, Tape Library. Etc...
    Rack 4 ComS circuits, voice router, call recorder, a few switches, Digital Signage server.
    Rack 5 UPS, 5 2U servers, KVM, Call manager Server, Voicemail Server, 2x NAS, SAN, etc...
    10) A work in progress , it was never correctly planned and quantified by the installers.
    11) See 10. we have 15Kw of cooling though
    12) Very Heavy, but it's solid ground floor. We have considerde this in a previous room and moved downstairs.
    13) See 11

    Rob

  5. Thanks to twin--turbo from:

    GrumbleDook (22nd November 2012)

  6. #4

    glennda's Avatar
    Join Date
    Jun 2009
    Location
    Sussex
    Posts
    7,810
    Thank Post
    272
    Thanked 1,135 Times in 1,031 Posts
    Rep Power
    349
    This is for my previous school

    1. Secondary
    2. 1600
    3. 3 x 4
    4. no
    5. Yes built out of old store room.
    6. 3 (was 4)
    7. HP
    8. 19" 42U 1200
    9. rack 1 4U UPS - Rest Servers 4U San 1U Fiber Switch. Rack 2 - Switching and Patch panels Rack 3. Servers, KVM and routers. 1 x B500 free standing ups
    10. B500 is 3 phase 32 amp, APC SUA10000 - 32amp 3 phase
    11. not a clue
    12. A lot
    13. Don't know but had two large Daikin Air con units for the room kept at 19 degrees.

  7. Thanks to glennda from:

    GrumbleDook (22nd November 2012)

  8. #5

    DaveP's Avatar
    Join Date
    Oct 2006
    Location
    Can't talk now: The mother-ship is calling!
    Posts
    8,912
    Thank Post
    351
    Thanked 1,291 Times in 882 Posts
    Blog Entries
    4
    Rep Power
    1129
    1. Secondary [Academy status acheived]
    2. 1200
    3. 2.6 x 3.2 x 3.1 [High ceilings!]
    4. Server: No other use. Server Room: Storage of old kit awaiting repair and new kit awaiting deployment.
    5. Don't know. It has always been a sever room while I have been here [9 years now]
    6. Two. One for switches, one for servers.
    7. Think one might be CISCO: It has lost all branding [Switches] The server one: Don't know.
    8. Server rack: 81" x 31" x 32" Switch rack: 23" x 26" x 53" [Exterior dimensions]
    9. Server rack: 16 port KVM, LT03 tape drive with two tape libraries, 5 SUN servers for offsite network access, 7 Dell servers, 2 HP servers, 1 UPS. Switch rack: 4 switches, various makes and numbers of ports, 6 Ethernet patch panels, 2 fibre media modules.
    10. Don't know.
    11. Don't know.
    12. No idea but HEAVY!
    13. Don't know: Can say that it is a Dakin Inverter.

  9. Thanks to DaveP from:

    GrumbleDook (22nd November 2012)

  10. #6

    twin--turbo's Avatar
    Join Date
    Jun 2012
    Location
    Carlisle
    Posts
    2,334
    Thank Post
    1
    Thanked 381 Times in 340 Posts
    Rep Power
    150
    With respect to (10)

    The design and install were poor.

    Insufficient outlets were specified , loadings not checked, etc. We battled to have it sorted but got nowhere. We are still neeedding to rectify this.

    As an example (and this is on our other site which came second!) they specified too few cabinets for the server room despite us asking them to provide rack diagrams to ensure the space.

    So after primary install they agree that there needs to be another rack to house equipment sitting on the floor. And it would need a UPS, and as such would need power.

    My colleauge "Z" rings me up. we will call the installer "X"

    Z: "Hi Rob, X have had a look in the ceeling and say there is a feed already there, so they can put in the extra UPS no problem"
    Me: "Realy? A Spare 32A? Bonus.."
    Z: "No, it's a 16A but X assure me it's fine"
    Me: "But the UPS is an APC RT6000 right?"
    Z: "Er, yeah... X say it's fine"
    Me: "But 6000VA will overload the Supply"
    Z: "Will it, they say that's how the other one is connected"
    Me: Spits and rants.
    Me: "Ask them to look on the back panel of the ups next to the incommer, look at the Rated supply. It's not 16A!!!!!"
    Me: "So they need to fix that one too!"




    Rob

  11. Thanks to twin--turbo from:

    GrumbleDook (22nd November 2012)

  12. #7

    twin--turbo's Avatar
    Join Date
    Jun 2012
    Location
    Carlisle
    Posts
    2,334
    Thank Post
    1
    Thanked 381 Times in 340 Posts
    Rep Power
    150
    With Respect to (11)

    Total heat output was calculated by "X" based on thermal output from device's . Obviously that is MAX output. Their calcs came in at under 7.5Kw

    So we run two 7.5kws for N+1

    Rob

  13. Thanks to twin--turbo from:

    GrumbleDook (22nd November 2012)

  14. #8

    twin--turbo's Avatar
    Join Date
    Jun 2012
    Location
    Carlisle
    Posts
    2,334
    Thank Post
    1
    Thanked 381 Times in 340 Posts
    Rep Power
    150
    Also..

    "X" put the structured cabinet on teh end of the run of cabinets. So there is a mass of cabling all running one way.





    Basicaly if we had planned it, then It would ahve been done a whole heap better.



    RANT OVER....

    Rob

  15. Thanks to twin--turbo from:

    GrumbleDook (22nd November 2012)

  16. #9

    tmcd35's Avatar
    Join Date
    Jul 2005
    Location
    Norfolk
    Posts
    5,665
    Thank Post
    850
    Thanked 893 Times in 738 Posts
    Blog Entries
    9
    Rep Power
    328
    Quote Originally Posted by twin--turbo View Post
    With respect to (10)

    The design and install were poor.

    Insufficient outlets were specified , loadings not checked, etc. We battled to have it sorted but got nowhere. We are still neeedding to rectify this.


    Rob
    After last weeks fiasco I've got the Business Manager to agree to getting the wiring in our server room sorted. The UPS holding up the main switch and routers in Rack1 died. So I risked my life for the sake of the school and climbed behind the racks to re-wire direct into the mains. Now...

    I have no idea where the mains is coming from. We have 1 thick cable from a fused spur labled "servers" feeding the other rack. However in Rack 1 we do have 3 5-gang extension cables plugged into each other. Until the UPS failed and I rewired what I could, there where Y-splitter coming off of those and in once a Y-splitter off a Y-splitter, plugged in to a 5-gang extension, plugged in to a 5-gang extension.

    I thank the last NM for the mess that is Rack1 (both electric cabling and data cabling - mess!!!). Although I have, er, ignored the problem for the best part of four years (if it ain't broke for $dietys sake DONT TOUCH IT). I have a major re-wireing effort planned next summer. If the school hasn't burn't down before then...

  17. Thanks to tmcd35 from:

    GrumbleDook (22nd November 2012)

  18. #10


    Join Date
    Jan 2006
    Posts
    8,202
    Thank Post
    442
    Thanked 1,032 Times in 812 Posts
    Rep Power
    339
    1. S
    2. 1750
    3. 16' x 10'
    4. No
    5. Yes, it was last used as a cupboard for drama but I don't know what it's original purpose was
    6. 4
    7. Compaq and some random racks
    8. 2x 19" x 42Ux 1200 1x19"x42U x 600 and 1x19"x24Ux600
    9. 1 has 10 home built servers. 1 has SAN and !BM Bladecentre. 1 has external network equipment 1 has internal network equipment (9 switches)
    10. 970W switches 2.6KW servers (rack 1). don't know about the other
    11. don't know
    12. don't know
    13. 32 metres cubed per min. Can't find BTU specs

  19. Thanks to CyberNerd from:

    GrumbleDook (22nd November 2012)

  20. #11

    AngryTechnician's Avatar
    Join Date
    Oct 2008
    Posts
    3,730
    Thank Post
    698
    Thanked 1,212 Times in 761 Posts
    Rep Power
    394
    1. Primary (Prep)
    2. 510
    3. 250cm D x 220cm W x 280cm H
    4. No
    5. Conversion, previously one corner of open plan office
    6. 1
    7. Standard and Pochin Enclosure Systems
    8. 800 x 1000 42U
    9. 17U servers, 6U patch, 2U cable management, 8U switches/routers, 9U UPS = 0U spare!
    10. Available: 4800W, drawn 2000W approx.
    11. Unknown
    12. Unknown
    13. Unknown

  21. Thanks to AngryTechnician from:

    GrumbleDook (22nd November 2012)

  22. #12
    mthomas08's Avatar
    Join Date
    Jun 2008
    Posts
    1,615
    Thank Post
    135
    Thanked 165 Times in 146 Posts
    Rep Power
    62
    1.S
    2.1600
    3.Approx dimensions of your server room
    4.Yes, Technician+desk and storage - is also first room before our office.
    5.Yes was previously 1 small office + storage - wall setup for previous Head of ICT (when he was head of IT and ICT)
    6.2
    7.Dont know
    8.Dont know
    9.2X UPS, 10X Servers, 2X Switches

    Sorry couldnt tell you the rest. All I know is a seperate line was put in for power this year (power cuts/trips occuring everywhere) and we do have air con finally working fully in the room.

  23. Thanks to mthomas08 from:

    GrumbleDook (22nd November 2012)

  24. #13

    3s-gtech's Avatar
    Join Date
    Mar 2009
    Location
    Wales
    Posts
    2,779
    Thank Post
    146
    Thanked 564 Times in 508 Posts
    Rep Power
    153
    1. Secondary
    2. 850
    3. 3m width x 6m length x 3m height
    4. No
    5. Yes - built long before servers - probably a stroage area
    6. 2
    7. Dell
    8. 19" x 42U
    9. 1 is 4U UPS, 15U or so servers with a shelf for a Mac Mini etc, the rest blank. 2 is 11U of switches, 1U of router, 6U of patch panels, the rest blank.
    10. 1 is 2 x 3000VA UPSs, 50% and 10% load. 2 is 1 x 3000VA UPS, 10% load.
    11. Not a clue. Lots, still a few Netburst Xeons in there. Very little in the second rack.
    12. At a guess, 150Kg for the first rack, and 75Kg for the second. Solid concrete first floor.
    13. Again, not sure. Small unit, 9KW or so? Don't know how much heat it can deal with though.

  25. Thanks to 3s-gtech from:

    GrumbleDook (22nd November 2012)

  26. #14

    bossman's Avatar
    Join Date
    Nov 2005
    Location
    England
    Posts
    3,920
    Thank Post
    1,193
    Thanked 1,063 Times in 754 Posts
    Rep Power
    329
    @GrumbleDook:

    1. S
    2. 750
    3. 4m x 2m
    4. No
    5. Yes – Store room
    6. 2
    7. APW and Cooper B-Line
    8. Both 19” 42U 1200s
    9. Cooper B-Line = 6 x 2U’s PSU, 8 x 2U’s Servers, 2 x 2U SAN’s, 1 x 2U backup disk box, 1 x 2U Quantum LT04 16 tape-loader, 2 x 1U cable tidies, 2 x 1U Gig switches, 1 x 1U KVM x 16 usb

    APW = 3 x 6U Servers, 3 x 2U UPS, lots more space to fill

    10. Cooper = 14w APW = 2.9w
    11. 25000 BTUs
    12. Just put me back out!!! Special non static floor covering over solid concrete.
    13. 40000 BTUs
    Last edited by bossman; 22nd November 2012 at 03:02 PM.

  27. Thanks to bossman from:

    GrumbleDook (22nd November 2012)

  28. #15
    DSapseid's Avatar
    Join Date
    Feb 2007
    Location
    West Sussex
    Posts
    1,152
    Thank Post
    130
    Thanked 54 Times in 47 Posts
    Rep Power
    38
    1. S
    2. 557
    3. 5x4
    4. Small bit of storage and has my 44" large format printer in
    5. Yes 2 Store cupboards. One was taken over in 2003 the second and the server room double to present in 2011.
    6. 2
    7. Prism
    8. 19" 42U 1200
    9. Rack 1: 1U kvm, 8U UPS (i think), 33U servers (again i think! the rack is full!) Rack 2: 10U Switches, 6U Patch Panel, 8U Cable management, 3U county broadband stuff
    10. not a clue! UPS is 15kva and supplies both racks
    11. not a clue!
    12. Hate to think!! The UPS was 1/3 ton on its own!
    13. 2 x 7kw Daiken Units/

    edit: forgot to mention that rack 1 has 2U of patch panel in the back and rack 2 has 3 shelves on the back which have the mac mini and mac pegasus drive and enviromental monitoring etc on.
    Last edited by DSapseid; 22nd November 2012 at 03:07 PM.

  29. Thanks to DSapseid from:

    GrumbleDook (22nd November 2012)

SHARE:
+ Post New Thread
Page 1 of 3 123 LastLast

Similar Threads

  1. Multiple Sclerosis Challenge
    By NBC_Sys_C-ord in forum General Chat
    Replies: 0
    Last Post: 26th June 2007, 02:19 PM
  2. Please Help - What are the challenges and opportunities faci
    By doc69 in forum School ICT Policies
    Replies: 2
    Last Post: 20th May 2007, 07:28 PM
  3. Who wants $50 - web challenge!
    By _Bat_ in forum Web Development
    Replies: 5
    Last Post: 14th March 2007, 01:09 PM
  4. Challenge
    By SteveT in forum General Chat
    Replies: 12
    Last Post: 30th April 2006, 08:27 PM
  5. Replies: 8
    Last Post: 13th February 2006, 03:05 PM

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •