+ Post New Thread
Page 1 of 2 12 LastLast
Results 1 to 15 of 25
General Chat Thread, ICT Support Resource Levels in Schools in General; As a one-man band in a 250 workstation school I'm trying to present my boss with typical support levels found ...
  1. #1

    Join Date
    May 2011
    Location
    Cambridge
    Posts
    2
    Thank Post
    0
    Thanked 0 Times in 0 Posts
    Blog Entries
    1
    Rep Power
    0

    ICT Support Resource Levels in Schools

    As a one-man band in a 250 workstation school I'm trying to present my boss with typical support levels found in schools as a comparison. I know this varies hugely and there are all sorts of reasons for that but, in general, my estimate is that to support 250 workstations, phones, 7-server domain and two sites I reckon two staff is about minimum. I'd appreciate any comments.

  2. #2
    JonThompson's Avatar
    Join Date
    Nov 2011
    Location
    Leicester
    Posts
    177
    Thank Post
    18
    Thanked 26 Times in 19 Posts
    Rep Power
    10
    At my previous place the ratio was 125 PC's per technician (FE college), so two in your case would seem reasonable. At my current place, we have two full time staff - NM and Snr Tech (me) and two 1 year university placement students who are replaced each year with new students.

  3. #3

    Join Date
    May 2011
    Location
    Cambridge
    Posts
    2
    Thank Post
    0
    Thanked 0 Times in 0 Posts
    Blog Entries
    1
    Rep Power
    0
    Many thanks for the response. I am polling a few schools directly too and two seems to be the bare minimum often with extra for AV etc.

  4. #4
    Cache's Avatar
    Join Date
    Apr 2008
    Location
    Cumbria
    Posts
    1,222
    Thank Post
    454
    Thanked 177 Times in 174 Posts
    Blog Entries
    3
    Rep Power
    65
    I'm in a similar situation to you, except I'm a single site and trying to get a 2nd member of staff.

  5. #5
    Sirbendy's Avatar
    Join Date
    Nov 2005
    Posts
    2,298
    Thank Post
    8
    Thanked 203 Times in 154 Posts
    Rep Power
    110
    500ish "fixed" workstations, also laptops, IP phone systems, CCTV and security systems, 6 ESX servers running lots of Vservers, across 3 buildings on 1 site - 2 staff here. NM is currently bogged down in CMiS/SLASC/Data verification/Timetabling, so I'm manning the helpdesk and going out to do stuff. Hectic, yes..a bit!

  6. #6

    Join Date
    Nov 2011
    Posts
    56
    Thank Post
    1
    Thanked 9 Times in 7 Posts
    Rep Power
    22
    Our technicians support over 1,000 workstations at any given location. They do not directly support their own servers or network at this time, though.

  7. #7

    Oaktech's Avatar
    Join Date
    Jul 2011
    Location
    Bournemouth
    Posts
    2,827
    Thank Post
    778
    Thanked 548 Times in 428 Posts
    Rep Power
    261
    this thread may be of interest...

    computer:tech ratio

  8. #8
    clareq's Avatar
    Join Date
    Dec 2005
    Location
    Doncaster
    Posts
    732
    Thank Post
    53
    Thanked 189 Times in 125 Posts
    Rep Power
    101
    There are 4 of us here with 1400 computers, 450 of them laptops, and 23 servers. We also look after phones, door entry system and a small (65 machine) mac network. We are split site.

  9. #9
    tb2571989's Avatar
    Join Date
    Jun 2010
    Location
    Bristol
    Posts
    162
    Thank Post
    19
    Thanked 11 Times in 10 Posts
    Rep Power
    10
    Me, and a Network manager. 600 Student laptops, 300ish Desktops, 120-odd Staff laptops. 40ish iPads. 20 Servers, physical and virtual. 150 Staff, 800 students. Phones, CCTV, single site, and we're term time only. We do not cope.

  10. #10
    bushby's Avatar
    Join Date
    Jul 2010
    Location
    winchester
    Posts
    531
    Thank Post
    61
    Thanked 61 Times in 53 Posts
    Rep Power
    30
    my self and the nm here 200 machines but all dual boot mac and win 7, 4 servers (we need more), they only got me last year and its made a diffrence already to the running of the it here.

  11. #11

    Join Date
    Oct 2007
    Location
    Newcastle Upon Tyne
    Posts
    453
    Thank Post
    148
    Thanked 67 Times in 58 Posts
    Rep Power
    44
    We Have two sites, total of around 900 students, 500 machines all Win 7, and around 18 servers (we are in process of virtualisation). We have a NM, 3 Technicians and 1 AV Tech.

    Look at this though Case study: Essa Academy's high-tech approach to education - 02 Oct 2012 - Computing Feature 900 apple devices and one technician because the students can act as technicians too.

  12. #12

    Join Date
    Jun 2010
    Posts
    387
    Thank Post
    35
    Thanked 57 Times in 54 Posts
    Rep Power
    32
    Me, senior tech, and 2 other techs - 1100 PCs, 20 servers, SIMS, SLG with full parent rollout, FMS, 1550 students, 250 staff, phone system, door entry system, lunch contract system, BYOD, 70 iPads, 30 Android tablets, 150 projectors, all usual subject specific software (sibelius, CS5.5 etc) a banging headache and a partridge in a pear tree

  13. #13

    Join Date
    Dec 2009
    Posts
    914
    Thank Post
    98
    Thanked 184 Times in 159 Posts
    Rep Power
    54
    700 machines, 4 ESX hosts, 2 netapps, 20 virtual servers, ruckus wireless, cisco phone system + 1 primary to look after, classroom support to do now and again as well as all the other bits and pieces. team of 2 (plus a director of ICT who's job isnt day to day support)

  14. #14
    36Degrees's Avatar
    Join Date
    Jan 2010
    Location
    Nottingham
    Posts
    1,060
    Thank Post
    165
    Thanked 153 Times in 124 Posts
    Rep Power
    52
    NM + Tech. Approximately

    1000 Pupils
    180 Staff
    275 PCs
    100 Laptops
    225 Thin Clients
    20 servers

    Website, VLE, Parental Engagement Portal, Home - school access for all, Cashless catering

    1 site, 2 buildings

  15. #15

    fiza's Avatar
    Join Date
    Dec 2008
    Location
    London
    Posts
    2,169
    Thank Post
    430
    Thanked 314 Times in 265 Posts
    Rep Power
    153
    Quote Originally Posted by JonThompson View Post
    At my previous place the ratio was 125 PC's per technician (FE college), so two in your case would seem reasonable. At my current place, we have two full time staff - NM and Snr Tech (me) and two 1 year university placement students who are replaced each year with new students.
    Interesting about the University placement students. Do you pay these students?

SHARE:
+ Post New Thread
Page 1 of 2 12 LastLast

Similar Threads

  1. Replies: 0
    Last Post: 10th June 2012, 08:52 PM
  2. ICT Support Technician - High Park School, Bradford
    By Flora in forum Educational IT Jobs
    Replies: 3
    Last Post: 8th February 2012, 01:55 PM
  3. Future of ICT provision/support in schools
    By KWestos in forum General Chat
    Replies: 37
    Last Post: 11th May 2011, 08:09 AM
  4. ICT Support Manager - Hitchin Girls' School
    By IanT in forum Educational IT Jobs
    Replies: 0
    Last Post: 21st June 2010, 03:36 PM
  5. FITS - ICT Support in Education: Manager level 5 Review
    By wagnerk in forum Courses and Training
    Replies: 5
    Last Post: 18th June 2010, 09:38 PM

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •